search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
4


NEWS


Managing Editor James Parker


Publisher Anthony Parker


Account Director Midge Myatt


Senior Account Manager Steve Smith


Digital Marketing & PR Account Manager Suzanne Easter


Operations Director Shelley Collyer


Editorial Contributor Kim Neville


Events Coordinator Amy Madigan


Studio Manager Mikey Pooley


Production Assistant Georgia Musson


Digital Production Coordinator Kimberley Musson


Feature Coordinator & Publisher’s Assistant Kim Neville


Finance Director Simon Reed


Advertising & Administration 01435 863500


info@netmagmedia.co.uk Press Releases


editorial@netmagmedia.co.uk Registration &


Circulation Enquiries info@netmagmedia.co.uk


FROM THE EDITOR


A


t our most recent Building Insights LIVE round table, we were pleased to have both Barratt Redrow and Bellway Homes on board, to discuss the realities of delivering the Future Homes Standard, which is still thought to be emerging in its fi nal iteration this year. We were joined by both housebuilders’ technical innovation leads, in the form of Danielle Michalska of Barratt Redrow, and Bellway’s Jamie Bursnell.


One of the main takeaways from the event was that there were rumours that the generally preferred Option 1 (of two) of the FHS (which includes solar PV as well as direct mechanical ventilation, slightly lower air-tightness, and waste water heat recovery) was the Government’s preferred option too. However, they are only thought to be progressing Option 1 in an ‘enhanced’ 1.5-type version, which seeks further consultation around solar PV generation requirements. I can’t see this coming in fully in 2025 as planned, and several delegates felt the same way – in fact Bellway’s Bursnell reckoned it’d be more like the end of 2026 before the fi nal standard appears.


We gathered a range of valuable insights and recommendations from the event, which will be available in a report that can be downloaded from our dedicated netMAG Insights site, found at www.insights. netmagmedia.co.uk


Of course, the real challenge for the domestic sector (not that the Future Homes Standard doesn’t present challenges) is how we are going to tackle the retrofi t of the 18 million existing homes to bring them up to scratch. Barratt Redrow and Saint-Gobain have for several years now been testing a new build home (Energy House 2.0) built to anticipated Future Homes Standard ‘affordably’ in controlled conditions at the University of Salford (also the venue for a similar Bellway project, Future Home).


An Employee Owned Company


Cointronic House Station Road, Heathfi eld East Sussex, TN21 8DF


Now, however, Saint-Gobain is revealing some of the fi ndings of its original, but ongoing retrofi t simulation of a hard-to-treat Victorian end terrace on the Salford site – eHome 1. Demonstrating realistic, repeatable retrofi t measures including membranes, underfl oor heating and insulation, was the founding focus of the Energy House project, demonstrating the overall importance of tackling retrofi t as acknowledged by academia and industry.


Annual subscription costs just £48 for 12 issues, including post and packing. Phone 01435 863500 for details. Individual copies of the publication are available at £5 each inc p & p. All rights reserved


No part of this publication may be reproduced or transmitted in any form or by any means, electronic, mechanical, including photocopying, recording or stored in any information retrieval system without the express prior written consent of the publisher. Although every effort is made to ensure the accuracy and reliability of material published in Architects Datafi le, the publisher can accept no responsibility for the claims or opinions made by contributors, manufacturers or advertisers. Editorial contributors to this journal may have made a payment towards the reproduction costs of material used to illustrate their products. The manufacturer of the paper used within our publication is a Chain-of-Custody certifi ed supplier operating within environmental systems certifi ed to both ISO 14001 and EMAS in order to ensure sustainable production. Printed in England


This magazine may be recycled


Comprehensive results of performance in various weather conditions, including likely costs of installation and construction of different options are hard to fi nd, but Salford has produced results with boiler manufacturer Nesta showing “massive” potential energy savings by running a boiler at a slightly lower fl ow temperature. Hopefully the learnings are being disseminated clearly to industry, ‘behind the scenes.’


James Parker, Editor


Looking to update or cancel your ADF registration? Scan the QR code to visit our registration page. From here you can also register for our Digital


Issues and Newsletters. Alternatively, please visit architectsdatafi le.co.uk/subscribe


RADISSON BLU, SHEFFIELD Retaining a major slice of the Steel City’s heritage was the key to HLM’s new fl agship hotel


ADF_05_2025 Covers.indd 1 12/05/2025 10:02 05.25


ON THE COVER... Reporting on HLM’s complex and careful retention of an existing facade to provide a fl agship Radisson hotel in the heart of Sheffi eld.


Update your registration here:


For the full report on this project, go to page 28.


WWW.ARCHITECTSDATAFILE.CO.UK


ADF MAY 2025


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60