4
NEWS
Managing Editor James Parker
Publisher Anthony Parker
Account Director Midge Myatt
Senior Account Manager Steve Smith
Digital Marketing & PR Account Manager Suzanne Easter
Operations Director Shelley Collyer
Editorial Contributor Roseanne Field
Events Coordinator Amy Madigan
Studio Manager Mikey Pooley
Production Assistant Georgia Musson
Digital Production Coordinator Kimberley Musson
Feature Coordinator & Publisher’s Assistant Kim Neville
Finance Director Simon Reed
Advertising & Administration 01435 863500
info@netmagmedia.co.uk Press Releases
editorial@netmagmedia.co.uk Registration &
Circulation Enquiries
info@netmagmedia.co.uk
FROM THE EDITOR
I
t’s hard to believe that next year will be a decade since the Grenfell tragedy, the most devastating single event in UK construction since the second world war. The response has been patchy, with the golden thread and the Building Safety Act bringing in some much needed accountability, but also creating logjams of approvals at the regulator which aren’t producing the fast change needed.
An area which was left in limbo post-Hackitt was the promised reform of construction products regulation. Like the promised review of Approved Documents, the lack of signs of action is an indicator of the complexity and diffi culty of changing the status quo in a fragmented and confusing web of regulations, testing and procedures with little national coordination. However, the Ministry of Housing has now nailed its colours to the mast, with a Construction Products White Paper that comes with a pledge to “strengthen safety and regulation of building products, ensuring they are properly assessed before being used.” It also has a candid admission from the slightly ‘Brazil’ movie-sounding Under Secretary of State for Building Safety, Fire and Democracy – Samantha Dixon – near the beginning of the Foreword. Dixon says: “We must move from a framework originally designed to reduce technical trade barriers to one that places safety, accountability, public confi dence, and growth and innovation at its core.” In this simple sentence, there is an entire world of tangled commercial issues, vested interests, and lack of third-party governance, which have made the efforts of enlightened suppliers and specifi ers diffi cult to safeguard in projects. The Government says the White Paper will lead to a “crackdown on unregulated practices and weaknesses that are undermining the construction sector,” and that all products “must be properly assessed before being used in the building process.” It admits that only around a third of products are even covered by regulation, and this begs the question, how do you police the unregulated majority, without requiring a drastic shift to mandating regulated products?
An Employee Owned Company
Cointronic House Station Road, Heathfi eld East Sussex, TN21 8DF
Secondary legislation is expected later this year which will detail how this will all work. But, as the Government begins to make Annual Reports on Grenfell Tower inquiry implementation (fi rst report saying that 12 recommendations have been “completed,” they cannot hope to tick the box on the reform of construction products regulation any time soon.
Annual subscription costs just £48 for 12 issues, including post and packing. Phone 01435 863500 for details. Individual copies of the publication are available at £5 each inc p & p. All rights reserved
No part of this publication may be reproduced or transmitted in any form or by any means, electronic, mechanical, including photocopying, recording or stored in any information retrieval system without the express prior written consent of the publisher. Although every effort is made to ensure the accuracy and reliability of material published in Architects Datafi le, the publisher can accept no responsibility for the claims or opinions made by contributors, manufacturers or advertisers. Editorial contributors to this journal may have made a payment towards the reproduction costs of material used to illustrate their products. The manufacturer of the paper used within our publication is a Chain-of-Custody certifi ed supplier operating within environmental systems certifi ed to both ISO 14001 and EMAS in order to ensure sustainable production. Printed in England
This magazine may be recycled
Although the Building Safety Regulator is now a standalone body independent of the HSE, its list of challenges are huge, with nine months reportedly a standard wait time now for Gateway 2 submissions. As well as potentially being a symptom of under-resourcing, this is also a factor of the realities of having a single, consistent regulatory system, rather than the more piecemeal, if less accountable processes it replaces. Its performance was recently deemed “unacceptable” by a parliamentary committee, but it has managed to cut its backlog down to three open project submissions, admittedly by some sleight of hand involving creating another channel for “complex schemes”. Full review of Approved Documents – also advocated in Hackitt’s report – is the last and probably most elusive piece of the jigsaw. Apparently (at least in terms of reviewing Part B), it’s another thing the Regulator is currently doing. Bearing all this mind, for it to turn into the all-encompassing single construction regulator which has been called for will need huge funding and manpower to supply the demand.
James Parker, Editor
Looking to update or cancel your ADF registration? Scan the QR code to visit our registration page. From here you can also register for our Digital
Issues and Newsletters. Alternatively, please visit architectsdatafi
le.co.uk/subscribe
PROJECT REPORT: WEST
CARCLAZE GARDEN VILLAGE LHC Design’s complex masterplanning challenge in St Austell
ADF_03_2026
Covers.indd 1 11/03/2026 16:17 03.26
ON THE COVER The Folly, Kent (WGP Architects, Practice Profi le)
ON THE COVER... WGP Architects responded to the challenge of designing a “consciously sculptural” building discreetly set within the gardens of an Arts and Crafts house in Kent. For more information visit page 12.
Update your registration here:
Photo © Anthony Coleman
WWW.ARCHITECTSDATAFILE.CO.UK
ADF MARCH 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60