search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
26


PROJECT REPORT: CULTURAL, CIVIC & FAITH BUILDINGS


PERFOMANCE ENHANCEMENT


The original, outdated auditorium was stripped out and replaced with a new interior with more capacity but a more intimate feel; an adjacent ‘studio’ theatre is also a vast improvement on the former offering


investment in the town centre of Hertford,” say the architects, forming part of the council’s “wider urban strategy to open up the riverside to the public.” The project has therefore been planned to include routes through for pedestrians, which further enhances its position as a social and community hub, not a cultural ‘ivory tower.’ The new internal programme provides a range of flexible event spaces plus three cinema screens, a new ‘studio’ auditorium for smaller live acts and performances, and an expanded main auditorium suited for larger productions, with an added balcony level. The building’s new foyer plus riverside cafe-bar helps connect the building with the river, and the old theatre auditorium with the new additions.


Brief & design approach The commercial drivers largely centred around increasing the capacity of both cinema and theatre provision, and


WWW.ARCHITECTSDATAFILE.CO.UK


increasing the quality of what Hertford could stage as a ‘receiving house’ and provide first-run cinema releases. The existing 1970s auditorium had “very much a civic hall feel,” with around 400 retractable seats, and “lacked any sense of grandeur,” says Bogle. It also had a very small adjoining ‘black box’ studio. The only real connection to the river in the built form was a hireable function room “which hung over the river,” says Bogle, that wasn’t maximising the opportunity of the site. The building had seen a light refurbishment in 2010, however this was focused on the front of house and some technical upgrades to accommodate ‘second release cinema.’ Already a venue punching above its weight before the interventions by Bennetts Associates, the expanded capacity – particularly that of the theatre – increases the venue’s reach on the national touring circuit, plus giving the potential to generate much more of its own work.


ADF JULY/AUGUST 2024


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68