DESIGN IN MENTAL HEALTH AWARDS 2025
Project of the Year – Refurbishment
group consultation rooms, three clinic spaces, and ancillary areas. A set of design parameters was established early on to steer the project, supplementing the standard HTM regulations and anti-ligature design considerations.
Seamlessly integrated into the existing urban realm “Externally, seamlessly integrated into the existing urban realm with extended paving, a new dedicated entrance door has been created away from the primary building entrance atrium to increase privacy for patients. Internally, outpatient clinic design revolves around creating a series of therapeutic spaces for a variety of potential users. Careful consideration was focused on the interior design – including tall ceilings, omission of dead-end corridors, and how colour palettes create visual relief.” The judges said: “The GMMH Central
Park NHS Hub exemplifies how intelligent, empathetic design can enhance mental health services at every level. This outstanding refurbishment brings together multiple services under one roof.” Sophie Bullimore, Editor at Building
Better Healthcare, presented the award to the winning team.
Service-User Engagement Kingsway Group, Gilling Dod Architects, and Britplas, received this year’s Service- User Engagement Award for creating ‘The Trauma-Informed Innovation Room’. Their entry explained: “Two years in the making, the Co-Production Bedroom Collaboration Project aims to inspire a new benchmark in design, and show what can be achieved through co-production and collaborative innovation. With an initial focus on neuro- inclusive and trauma-informed design principles within CAMHS environments, the ongoing project aims to share and apply its key learnings to benefit the wider mental healthcare space.” The full-scale concept bedroom, co-
produced with Experts by Experience and NHS Trusts, now serves as a demonstration of the project’s key learnings. Located at Kingsway Group’s Sidcup headquarters, it has been visited by industry professionals from across the globe since it opened in June 2024. The project began in early 2023, when – engaging with Experts by Experience and
THE NETWORK | AUGUST 2025
NHS Trusts – Gilling Dod, Kingsway Group, and Britplas, embarked on a collaborative research and design concept project ‘to challenge the norms/constraints of CAMHS inpatient bedroom design, and open the process to broader drivers such as neurodiversity, Autism, and trauma- informed care’. Subsequent steps included Experts by
Experience, Trusts, and mental healthcare architects, participating in ‘a holistic review’ of existing CAMHS bedroom designs and their emotional influence on service-users, co-production workshops, and a ‘Drawing Review’ involving EbEs, which ‘sought to take a bedroom back to its main purpose – creating a homely and personal space in which children and young people can rest, recuperate, and heal’. Collating all input from Experts by
Experience, NHS Trusts, and architects, the final drawings were then produced for the CAMHS Bedroom Collaboration, with construction starting in February 2024. The bedroom was officially unveiled at Design in Mental Health 2024. The judges said: “This project is a
masterclass in meaningful co-production. The CAMHS Bedroom Collaboration didn’t just listen to service-users; it empowered them to lead the design journey. A well- deserved winner that sets a new gold standard for engagement in mental health design.”
Service-users’ ‘vital role’ in Silverwood’s design Awarded a Highly Commended was the new 64-bedded Silverwood inpatient unit in Chertsey in Surrey, designed bv Arcadis for Surrey and Borders Partnership NHS Foundation Trust. The architects said: “We recognised from early on the vital role service-users have in ensuring Silverwood would not only be fit-for-purpose, but also a facility with a shared sense of ownership, and one that weaves the legacy of those with previous inpatient experiences to ensure that future service-users can recover in the best possible facilities.”
Team of the Year The Team of the Year Award – sponsored by Kingsway Group, went to the Capital, Estates and Facilities Team at Greater Manchester Mental Health NHS Foundation Trust, for its delivery of the Central Park project in Manchester – which offers 60,000 ft2
of space dedicated to mental
health services, featuring agile open-plan offices, private rooms, conference facilities, and a new outpatient community clinic. Over 12 different services are co-located at Central Park. The entry explained that for GMMH, the
facility ‘addresses several property risks by accommodating services previously housed in outdated premises’, with the consolidation and multi-occupancy
Service-User Engagement
17
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46