FIRE SAFETY


Deep cleaning – HPV fogging/ COVID-19 nebulising spray One unique challenge in the hospital environment for the fire detection system is the use of Hydrogen Peroxide Vapour (HPV). This type of cleaning fog is used to completely sterilise a room after use by each infectious patient, or the presence of an infectious substance that might have contaminated the area. The issue arises because the fog itself is similar in consistency to smoke, and therefore often activates optical smoke detectors. It is thus best practice to disable the detector and cover it to prevent false alarms while HPV fogging is taking place. Some systems will allow disablements to be made easily, and even via a mobile app. However, on some older systems, disabling detectors can be dangerous, since the process of recording which detectors have been disabled for fogging is only undertaken in a physical logbook, and is not visible on the control panel. Forgotten disablements will reduce overall system integrity and pose an immediate risk to life. A minor improvement that can also be made to make covering detectors quicker is to recess the cabling to the detector, so that any cover can get a full seal without the additional set-up of taping around the wiring.


In addition to issues with HPV deep cleaning, many sites have recently encountered a similar problem associated with paracetamol spray given off by ventilators treating COVID-19 patients. Adjusting the affected detectors’ sensitivity modes can instantly alleviate this issue, but if the problem persists, undertaking a full risk assessment, and increasing (human) monitoring, may justify contradicting BS5839 Pt 1 2017, and temporarily replacing smoke with heat detectors in these areas.


Contingency wards


There has been a recent push in the NHS to increase the number of contingency wards in hospitals. Converting live mental health hospital wards to become anti- ligature is extremely challenging, as the works have to be thorough, and may involve replacing bathroom facilities, as well as doors, lights, ironmongery, radiator covers, decorations, and some flooring. Replacing the fire detector for an approved anti-ligature alternative should be easy, but depends on backwards compatibility, and having an adaptive system. Adding additional detectors to an existing loop, and being able to address the new detectors to be discovered by the panel quickly, is ideal. The current use of load release anti-ligature detectors, while approved, still poses a significant risk, as the detector itself could be used to cause harm to the patient or others. In addition, once the detector is load


84 Health Estate Journal September 2020


Irina Cruse.


Harry Buck.


Salvy Vittozzi.


released it is no longer operational, and will cause a lapse in system integrity. There is an innovative alternative to the load release anti-ligature detector which solves this issue – an approved flush- mounted, anti-ligature, anti-vandal detector which cannot be removed from the ceiling due to anti-tamper screws. Apollo’s Soteria Dimension Specialist Optical detector eliminates the risk to patients and staff, and ensures fire system integrity. This detector is also fully backwards compatible, and can be added to any existing system from the same manufacturer.


Conclusions


There is an array of challenges to address in managing a fire detection system in a hospital; without due consideration these can lead to both high maintenance costs, but also – more importantly – to a lapse in overall protection for vulnerable people. In this article we have outlined several challenges, as well as recommendations to improve system performance and minimise cost, including:


Jeff Cutler.


n Having an Open Protocol system to reduce total cost of ownership.


n Installing detectors with in-built drift compensation, which have a longer lifecycle.


n Placing covers over manual call points, and considering recessing MCPs into the wall to the regulatory limit.


n Temporarily replacing smoke detectors with heat detectors in areas undergoing building work.


However, there are many more issues which will be important to consider. For more information on any particular features or benefits of a hospital fire detection / alarm system outlined in this article, and to discuss any other challenges not mentioned, consult an expert.


Acknowledgments


The authors would also like to thank their colleagues, Regional Sales manager (South), Salvy Vittozzi, and head of Systems at Apollo Fire Detectors, Jeff Cutler, for their input to this article, and to extend a special thanks to Steve Manuel, Fire Officer, Luton & Dunstable Hospital, and William Espiner of Aylsebury Fire Systems.


hej


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92