search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
MACHINERY | PIPE JOINING


Above: McElroy pipe joining


equipment has helped in setting up an agricultural college in Rwanda


New college McElroy pipe joining equipment has played a part in setting up a new college in Rwanda. RICA (Rwanda Institute for Conservation and Agriculture) is an English-speaking university that combines research, education and extension services to students studying agriculture. It has a focus on conservation agriculture, which includes irrigating based on crop water use – to maximise profit and efficiency. The college exists entirely off-grid – so power is


Right: Huerner’s new socket welder is designed for all-purpose welding applications in PP, PP-R, and HDPE pipeline grids


generated by a solar field on university property and water must be pumped from a nearby lake. This is done by creating a water line from six-inch pipe, which was fused together using a TracStar 412 and a Pit Bull 26 from McElroy. The bulk of the ring main of potable and non-potable water for the gravity lines to supply student houses was welded with a Pit Bull 26 – a manual machine that combines functionality with a compact and rugged design. “From there, we welded a network of pipes connecting up to newly-built houses for the first-year students, as well as faculty housing for the teachers and kitchen,” said Jared Hall, an HDPE fusion specialist at Rwandan company Remote Group. “The system provides potable water for the teachers and kitchen, as well as non-potable water for fire suppression. We also connected water to barns for animals nears the students’ houses, along with water sources for chickens and cows.” The TracStar was used for an irrigation pivot that consisted of 200mm OD and 250 OD pipe. An earlier project at the university – from 2016,


at Lac Nasho – fused 55km of piping with 63 centre pivots to bring water to one of the driest areas in Rwanda. “For the Nasho project, we used two TracStar


900s, a TracStar 500, as well as two TracStar 618s,” said Hall. The soil there was dry and clay-like – with around


38 PIPE & PROFILE EXTRUSION | November/December 2022 www.pipeandprofile.com


2,000 small farm holders only growing crops when the rain allowed. After the project was complete, the farmers could plant at set times because they no longer relied on rain. “This increased their yield,” said Hall.


Saddle fittings Huerner of Germany showcased its HWT 160 SW–S socket welder – for saddle-style fittings – at K2022. It is designed for all-purpose welding applications


in PP, PP-R, and HDPE pipeline grids. It can make branch-offs of OD 20-90mm from


straight pipelines of OD 40-160mm. It is ued for making lines branching off from the pipe in a saddle position in tight corners – as well as work- shop applications meant for serial manufacture. Here, it uses a moveable right-hand and left-hand pipe clamp. The standard package includes the all-purpose pipe aligners for straight pipelines sized OD 40-160mm, a bracket compatible with various cord- less drills/screwdrivers and clamps for branch-offs in the saddle position – sized up to OD 63mm, allowing precision alignment of cylindrical and octagonal fittings.





IMAGE: HUERNER


IMAGE: MCELROY


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54