Complex model tests on MOHO NORD Tension Leg Platform
144692
In an ambitious campaign the
MOHO NORD TLP was extensively tested in wind,
waves and current.
Arjen Koop & Jule Scharnke
a.koop@marin.nl
14 report M
odel tests took place for the TLP alone, as well as with the TLP coupled to a semi-submersible.
For both configurations, in-place wave tests and VIM tow tests were carried out. MARIN’s capabilities and experience in complex model testing resulted in a very successful and interesting test campaign.
In-place tests were performed in the Offshore Basin with its 30 m deepwater pit, which is necessary to be able to model the TLP with its tendons over the full water depth. The TLP was moored by 12 tendons and connected
to a semi-submersible at a distance of 25 m by a hawser system. The semi-submersible will be used for tender assisted drilling in the first phase of the field development.
The complex hawser system was modelled by four bi-linear springs linked together to represent the non-linear stiffness charac- teristics of the prototype hawser lines. The semi- submersible was installed in the Offshore Basin with a truncated and bundled mooring system, representing the mooring system stiffness of the full depth system. In the coupled setup with the
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24