feedback to concepts and provide full-scale testing opportunities. Secondly, industry partners such as Babcock, BAE Systems, MacTaggart Scott and CMN design concepts and manufacture test hardware and finally, R&D partners (AMC, MARIN) perform model tests, support full-scale tests and develop simulation tools.


Ambitious goal In order to achieve the ambitious goal of the JIP, a phased programme has been set up. During Phase 1 a compre- hensive and coherent set of requirements covering the navies’ needs for L&R systems was developed. This includes being able to operate in sea state 4 to 5, keeping the platform at a moderate speed (below 12 knots) and requiring only a limited platform crew. Concepts for L&R, taken from either literature or brainstormed within the project, range from fishing nets to robotic arms. In this phase logistics were also addressed. These concepts considered using the whole deck width - either aft or more forward - in order to be able to store a craft so it is possible to quickly pick up another craft. It became clear that a focus on automatic connections for side recovery, being able to lift in a sea- way and being able to retrieve zero-speed craft are critical issues that needed special attention.


During Phase 2 more detailed design, analysis, model and full-scale testing was conducted, and a generic hook design was developed. As a result of the first two phases, three solutions came top on the scoring matrix. - A cradle system (see Figure 1) consisting of a floating cradle that is connected to the ship and used as a capture mechanism for surface vehicles.


- A floating capture device that can be used to make an automatic connection to the painter line of surface vehicles.


- A planar system (Figure 2) that uses devices to span a capture line outside of the disturbed water to capture subsurface vehicles, which may be unpowered.


As well as developing the concepts, in Phase 3 specific critical issues are also considered. An example is investigating the best way to tow a RHIB alongside a platform, where instabilities can easily occur. Tests using a painter line boom on a RHIB were performed, as well as variations attaching the line to the stag horn or lower attached bridle.


Simulation tool A second important topic in Phase 3 is to develop a useful simulation tool, which is able to determine operational boundaries and the limits of particular concepts. It became clear that the


first validation data for specific critical parts of the chain of events in a launch or recovery still needed to be gathered. Therefore, special tests were done to evaluate the flow in a seaway around the platform and to characterise the hydrodynamic behaviour of RHIB-like craft.


The ultimate aim of Phase 3 is to deliver input to a NATO standardisation agreement (STANAG) on launch and recovery, to improve and validate simulation tools and to verify the concepts at model and full-scale testing. Finally, in addition to the LAURA JIP a more open general discussion platform has been established where launch and recovery issues can be mulled over, ideas exchanged within workshops and new joint industry projects can be started. For more information see www.larsforum.org.


Fig. 2 Planar system as tested at full scale with the foating ‘lobster pot’ awaiting recovery (left) and the planars (right) report 23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28