Case Study Scope of work


PTSG was appointed to design, install, test and commission packages of residential sprinklers and dry risers to the student accommodation


storey car park. Utilising the experience of multiple


companies


blocks and the multi- within our Fire


Solutions division, we provided a single point of contact and single package delivery across the two service disciplines, offering a streamlined process and single project team.


• Technical design and infrastructure sizing at tender/pre-construction stages.


• Supply chain resilience specifically prior to the Brexit announcement in October


2019. • Creating service efficiency.


Challenges Faced


As a result of the seven residential blocks having three sets of combined plant infrastructure,


what was needed to ensure the systems would work as required in line with the regulations.


To overcome this challenge, we worked closely with our client Imtech to technically specify and consult on how to effectively combine their domestic plant infrastructure with the residential sprinkler systems. This involved numerous communications with our client’s


technical team and project teams to review their strategy, amend as necessary and present the end user as a compliant solution.


As a result of this early effort and combined team approach, the scheme design we have today reflects the decisions discussed and made early in the process whereby blocks one to five are fed from a centralised


plant infrastructure base and blocks seven and eight have their own plant feeding them respectively. This has proved to be the best solution for the site, our client and the end user. we had a major challenge in identifying the requirements and specifying


Outcome


Efficiencies are afforded by using PTSG’s qualified and dedicated design team to design both the CDP elements for the residential


sprinkler systems and the


dry riser systems. As a result, the design team was able to manage and deliver the expectations of the client in a more timely manner through a centralised


structure.


We have found this approach helps to deliver a productive and proactive service, enabling us to go far beyond expectations.


fmuk 31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44