search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
VESSEL BUILD, REPAIR & MAINTENANCE


The Marine Group Expands Its Fleet With a Larger, More Powerful ‘Water


Injection’ Dredger The Marine Group’s Harbour Management Division has expanded its dredging capabilities with the recent completion of their bespoke built water injection dredger, CMS Seaka. Following the successful deployment of CMS Innovation, The Marine Group has made a significant investment in the development of a more powerful and highly efficient machine that adopts the same environmentally friendly water injection technology.


The Marine Group purchased CMS Seaka as a Multicat in 2018, which was then comprehensively redesigned by OSD-IMT and modified by the original builders, GRA ltd and our in-house team of engineers, Cardiff Diesel Services. The new design will allow the team to dredge more efficiently and in higher volumes than previous operations. While Seaka is powered by a Doosan V158TI engine, the vessel also houses a Sulzer A53-200 pump capable of pumping water at a rate of up to 330L per second. The 5m boom holds 27 outlets that have been oriented to provide maximum efficiency, dredging up to 450m3/hr.


The commission of Seaka is part of The Marine Group’s ongoing commitment to the evolution and development of Burry Port Marina. While water injection dredging has continually been used to develop channels and berths in the marina CMS Seaka will accelerate the process of taking Burry Port from a forgotten sailing destination back to its rightful status as the jewel of the Carmarthenshire coast.


While not working on The Marine Group’s numerous marinas around Wales, Seaka will be able to provide cost effective solutions for dredging to customers all over the country. Seaka, measuring


10m in length and 4.8 m across the beam, is transported to site via road in one piece, allowing the team to start work within 30 minutes of being in the water. The size of Seaka will allow marinas and ports to remain fully operational while dredging is undertaken.


Reaching a maximum depth of 8.5m Seaka will be the one of the most efficient water injection dredgers in the country, ideal for smaller ports where traditional dredging is un-economic.


28 www.dockyard-mag.com November 2020


Director of Operations, Rob Freemantle said; “Seaka was designed and built to keep small harbours and marinas viable with a cost effective dredging solution.”


Whilst 2020 has been an arduous year for a lot of Welsh business’, The Marine Group continues on its path of expansion, investment and diversification. Its investment in CMS Seaka highlights the business’ commitment to growing its Harbour Management Division. Whilst adopting an environmentally friendly approach by pioneering water injection technology it is also supporting its commitment to the environment. In the same year the business has expanded its offer to its fast- growing customer base and is now providing hydrographic surveying and harbour management consultancy services.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52