Keep Heating Systems Safe With Preventative Maintenance


Andy Green, Technical Director at Baxi Heating, offers advice on how to protect the heating system through a building lockdown


As the UK lockdown continues, it’s important that building owners are vigilant about implementing pre- ventative maintenance to protect heating systems in their empty build- ings. Heating engineers and facilities managers have a key role to play in ensuring that the heating system operates efficiently and safely once a property is reactivated.


Where a short-term building shutdown period is anticipated, our advice is to leave wet heating systems in operation at a reduced temperature, at around


14ºC. This will avoid the possibility of damp entering the building, reduce the risk of microbial contamination which can cause corrosion, and help building operators or facilities managers keep energy bills down.


Preventative Maintenance Introducing a weekly low usage main- tenance schedule will ensure that the system remains in top condition and avoid any risk of a legionella outbreak.


We recommend implementing the following programme:


• Carry out a visual inspection of the plant once a week, even where there is remote monitoring capability of both the building and heating system, to ensure that there is nothing untoward.


• Keep moving parts like pumps operating for ten minutes once a week


28 fmuk


to help prevent them seizing and failing when the building is reactivated. Most control systems will build this into their strategy.


• Allow the domestic hot water to reach pasteurisation temperature (60ºC) for one hour once a week to prevent bacteria forming and avoid the risk of legionella. Legionella bacteria are dormant below 20ºC and do not survive above 60ºC.


• Some water heaters, like our


Andrews Water Heaters MAXXflo Evo unit, will have onboard controls that operate a legionella cycle to ensure that the whole system is brought up to pas- teurisation temperature by monitoring the secondary return temperatures.


Long Term Closure


In the event of a long-term building closure, there is the option to drain down the heating and hot water ser- vice.


The system should be isolated com- pletely, ensuring frost protection from the system to prevent freezing. The building will need to be decommis- sioned completely and ventilation run through the building to prevent the build-up of microbial contamination.


Reactivating A Building When reactivating a site, we advise implementing the following 24-hour maintenance regime prior to reopening


• Carry out microbiological sampling to ensure that there is no contamination of the hot water supply. Depending on the outcome of the sampling, there could be a requirement to chlorinate the hot water system.


• Insurance inspections will also need to take place to ensure that the property is functional and compliant.


Follow Best Practice


Ensuring good quality water and eliminating the risk of contamination through best practice maintenance programmes is the safest way to enable the system to be reactivated quickly when required. And as heating and hot water is a vital service, this in turn will allow buildings, and the businesses and organisations they house, to bounce back rapidly once we re-emerge from lockdown.


the building:


• Twenty-four hours before bringing the building back into operation, fill the system, remove the air, and bring the hot water system back up to 60ºC.


• Open all of the outlets until they reach at least 55ºC to make sure that all stagnant water is removed before shutting them. Flush the outlets and pipes through thoroughly and carry out operational checks.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44