CAN MMC QUALITY REDUCE FIRE RISK IN BUILDINGS?


Mary McCollum of Sapphire Balustrades explains how the quality control possible through modern methods of construction (MMC) can reduce fire risk in buildings – particularly when installing balconies.


key players are increasingly turning to offsite construction for solutions. MMC offers improved efficiency, quality control, and cost savings, among many other appealing benefits. In the wake of numerous balcony fires, the Hackitt review, and drastic regulation changes, reducing fire risk in residential buildings is at the forefront of the minds of many throughout the supply chain. Not only is compliance with the latest regulations made difficult due to a lack of explicit and specific guidance, but with this guidance in a state of continu- ous evolution, the industry is left in a position of hesitation, anticipating further developments. But how does MMC relate to reducing


M


fire risk in residential buildings? Primarily, the benefit lies in the substantial improve- ment in quality control. A key takeaway from the Hackitt review was the need for higher levels of quality control. Hackitt pushed for clearer chains of responsibility with a top level ‘duty holder’ to be responsible for the safety of individual buildings. For said duty holder to verify the safety standards of all elements involved in a building, step-by-step quality checks must be carried out with a traceable history. These standards are integral to modular construction, but far more challenging with traditional methods.


WITH PRE-FINISHED MODULAR BALCONIES A HOLISTIC APPROACH TO PRODUCTION IS ACHIEVED AND QUALITY STANDARDS ARE MAINTAINED


WWW.HBDONLINE.CO.UK


odern methods of construction (MMC) may hold the key to a myriad of industry woes, and


Traditional methods of construction have always been plagued by the dramatic variation between different workers, and the results of their labour not meeting the specification. Understanding becomes diluted as the information is distilled from the intention at the design stage to the onsite interpretation of it. Variation in skill, time and conditions can result in dangerous inconsistencies. With traditional construction, quality


standards and fire safety are dependent on the complete synergy of a multitude of trades interfacing with each other. Achieving this level of cooperation and smoothness of project programme is extremely difficult, and costly delays are common. Offsite construction, on the other


hand, benefits from consistency along the production line, and controlled conditions reduce the opportunity for error. Factory environments entail regular checks allowing faults to be found and remedied. Highly trained specialised workers can


work with the support of supervisors without the complications brought by being onsite. Traditionally, balconies rely heavily on onsite finishing and install work, from concrete balconies cast entirely onsite, to steel framed bolt-on balconies which often claim the MMC title while relying heavily on onsite labour. With pre-finished modular balconies, a holistic approach to production is achieved and quality standards are maintained, just like car production. Limiting inconsistency reduces a range


of risk factors, including fire spread. Ineffective firestopping for example can leave hollows which can act as chimneys, allowing fires to spread more readily with greater risk to life and property. In a controlled factory environment these oversights can be avoided far more consistently. Another fundamental aspect of volumetric modular construction is the high level of design specification required. Especially when adopted early on,


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52