search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
“In Germany, people come and sign a contract and the building work goes ahead very quickly. In England it takes far longer to find a plot and gain planning permission. It can be very complicated and frustrating for everyone, but after planning has been achieved, we can go ahead and specify all the materials,” explains Baufritz’s Oliver Rehm.


“Much of our factory is automated, using machines that have been designed especially for us, and we use state-of-the-art CAD technology that’s linked to our systems to ensure millimetre precision.


“It’s great to see the product that you’ve designed being made so accurately by machines, and you don’t have to worry about the execution on site, because everything is so precise. I always feel elated when a house arrives from Germany on the back of a truck and is finished within just a few days – it’s a very exciting process.”


External walls are packed with Baufritz’s thermally efficient wood shaving insulation, made from off-cuts from the manufacturing process and protected from fire, fungus and pests using a natural treatment made from soda and whey. The shell is 100 per cent biodegradable and can be completely returned to nature.


“We did manage to block the road for several hours because our driveway is long and steep, so access was tricky, but everything was soon craned into position,” says David. “It only took four days to erect the walls and roof of the house, and I built a small scaffold tower and filmed the whole thing using a time-lapse


30 www.sbhonline.co.uk


camera – making a short film of our build.” The Jones’ were flown out to Germany prior to work starting onsite, where they liaised with their Baufritz project manager to choose all fixtures and fittings, including sanitaryware, tiles, flooring and light switches, leaving only the kitchen to be sourced separately. “It was enjoyable but tiring, because we’d be working well into the evenings,” says David. Not only is the house incredibly highly insulated and triple glazed, but it also benefits from a ventilation and heat recovery system. Built-in protection against electromagnetic pollution levels shields against cell phone radiation, and harmful substances are eliminated at every stage.


“The previous house had oil-fired heating, but after much thought we settled on installing a ground source heat pump, with underfloor heating on all levels,” says David. “We chose engineered walnut flooring for several rooms, with herringbone parquet laid in the sitting room, and followed this through with walnut for the internal doors and kitchen.”


The main kitchen was crafted in the UK from sustainable birch plywood, combined with locally-sourced sycamore and walnut wood to create the cabinetry and hand-carved drawers. Low energy appliances were chosen, including an eco-friendly boiling water tap. “What we love about this house, apart from the fabulous setting, is the feeling of quality,” says David. “Everyone comments that it’s a peaceful, calm and relaxing place to be, and it’s also a healthy home – both for us and the environment.” 


VAULTED


A high, vaulted ceiling coupled with the views makes the home’s master bedroom a tranquil and airy retreat


CONTACTS/ SUPPLIERS


DESIGN & BUILD, WALLS, WINDOWS, INSULATION, ROOF TILES,


SANITARYWARE (ETC) Baufritz


www.baufritz.co.uk


GROUNDWORKS Eclipse Construction www.eclipseconstructionltd. co.uk


BASEMENT


Glatthaar Fertigkeller www.glatthaar.co.uk


BESPOKE KITCHEN George Robinson


www.georgerobinsonkitchen s.co.uk


GARDEN DESIGN


Hannah Genders www.hannahgenders.co.uk


LIGHTING DESIGN Re:light


relight.ltd.uk


september/october 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84