Planning Permission Granted? What Next?


For most, securing planning permission is an ex , securing planning permission is an exciting milestone


in a project but it’s not the end of the journey and there is a lot to do before work can start on site. Paul Newman, Self Build Dir


Sense check


Once permission has been granted, take a moment to answer a few key questions:


• Have I got the right permission or do I want to change it? • Can the project be built (on my budget)?


• Are there any outstanding legal issues to resolve such as ransom strips of land to access the site, that might prevent the project going ahead?


When you’re satisfied with the answers, you can move on to the next step.


Pre-start check list It’s advisable to create a list showing what needs addressing before the groundworks commence. Many of the pre-build tasks highlighted here should run in parallel to reduce the amount of time spent on this stage of the process.


Discharging planning conditions Your full planning permission will invariably come with a list of conditions that need to be discharged before work can start on site. Typically, conditions relate to highways, access, building position, height, external materials to be used and landscaping.


Investigate charges It’s important to now confirm if any planning fees are due, such as planning obligations via Section 106 agreements (self-builders should be exempt). The CIL (Community Infrastructure Levy) is a similar charge – with this one you need to fill out the right forms at the right times to accept your liability and claim an exemption.


Self Build Director, Potton Develop the drawings The design must be developed to meet the Building R


construction. Depending on who produced the plans, there may well be significant technical issues to resolve before materials can be supplied to site. You’ll need to confirm the build system and agree a full design freeze so manufacturing drawings can be produced. Plan the foundations We recommend using an engineer to prepare the foundation plan. This route is cost effective and reduces risk. Commission a ground investigation to establish soil types, depths, consistency and ultimately load-bearing capacity. This will allow the engineer to produce a suitable foundation design.


the Building Regulations to enable ther


Choose your build route Are you planning to manage the project yourself and sub-contract trades, or opt for using the services of a professional project manager or builder? An increasing number of self-builders use a project manager or contractor to deliver the weathertight shell and then manage the fit out themselves.


Finalise funds Whatever your budget, prepare it well and stick to it. If you need a mortgage, the lender will probe your cost plan to check it’s realistic. You will also need to set some contingency. If you’re likely to change your mind as work goes on, costs will rise, so allow for this.


Health & safety This won’t be complicated if you work with responsible trades who know what they require to work safely. You’ll need to appoint a principle designer and principle contractor, create a health and safety file, submit a simple notification form to the Health & Safety Executive and maintain a construction phase plan.


BOOK ONTO THIS FREE SELF BUILD ACADEMY COURSE


Potton’s Self Build Academy course ‘Granted Permission – How to get your project moving’ explores all of the issues raised in this article and much more. It also provides software tool to help attendees organise their project, budget effectively, build safety and make a success of their build. Courses are held at Potton’s Self Build Show Centre in St Neots, Cambridgeshire.


UPCOMING COURSE DATES: 28th June, 31st August, 13th September


Book online or call


WWW.POTTON.CO.UK/COURSES T:01480 403285 WWW.POTTON.CO.UK E:SALES@POTTON.CO.UK T:01767 676400


YOUR FREE PLACE


BOOK


NEXT STEP


Potton Show Centre


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60