search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Justin Casey • Owner- Operator


(806) 730-2954 jcasey@pearlenergygroup.com


OUR PROCESS Fabrication


Pearl Energy Group operates a modular fabrication shop out of Lubbock, Texas, with a large network of vendors and suppliers. We are able to procure the parts needed to build, weld, and assemble our products.


• Running fully up to code (compliant with B31.1, B31.3, B31.4, and B31.1 amongst other ASME standards.), and operating to the highest standards of safety with maximum ef ciency.


• In shop we assemble the modular components to support production facilities & compressor stations.


We manufacture and procure a wide variety of products that include, but are not limited to: Containment


Liners


Pump chokes Gas-lift skids Launchers Receivers Manifolds


Flare systems Combustors Compressors Launchers Receivers


Pipe Spools Automation


Pre-insulated pipe Pre-fabricated pipe Pipe racks


Structural welding Gas Coolers


Vapor Recovery Units Structural Welding


www.pearlenergygroup.com 408 CR 7200 Lubbock, TX 79404


Consulting, Engineering and Design


How we service: • Working with your team to generate unique designs and models that are tailored speci cally to the needs of your projects. • One of our certi ed technicians will take  eld measurements and evaluate the site. • Ensuring a strong line of communication between the  eld, shop, and of ce.


Creating full turn-key solutions for our customer’s projects, starting from the concept stage.


Water treatment Heat trace


Valves, pipes, and  ttings Salt water disposal units Poly- pipe fabrication Coating


Surplus equipment procurement How our offsite manufacturing will keep your project on budget for implementation:


• Our “plug and play” concept and products are manufactured in our offsite location. • These components are built in truckable sizes to save costs on transportation. • Manufacturing and building our top of the line products in a controlled environment eliminates external threats, such as weather, that pose to slow down our schedule. • Once our products are  nished and effortlessly delivered, we enter the implementation phase.


Implimentation


Quick and affordable installation. • We provide construction management services to ensure quality communication between the  eld and the of ce.


• Manifolds and pipe racks bolt together easily. • Signi cantly reduces  eld fabrication cost.


Construction Management We want to be there every step of the way to ensure


quality implementation and communication. • One of our quali ed construction managers will be in the  eld overseeing the whole process, per request.


• Let us take your project from the concept stage all the way through implementation and completion.


• We’re here to build a relationship, so our job is not complete until you are happy with the results.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80