Taking an alternative route to drainage
When building or renovating a home with no connection to mains drainage for the disposal of sewage, alternative options have to be considered. Burnham Environmental Services’ Mark Newbery explains further
T
he UK currently has four different environmental regulators for surface and groundwater pollution control. These are as follows: • England – The Environmental Agency (EA)
• Wales – Natural Resources Wales / Cyfoeth Naturiol Cymru
• Scotland – SEPA (Scottish Environment Protection Agency)
• Northern Ireland – Northern Ireland Environmental Agency (NIEA). These regulators operate in different ways, and consequently generalisations have to be made. For example with the EA in England, a document produced by DEFRA (Department of the Environment, Fisheries and Rural Affairs) entitled ‘General Binding Rules for Small Sewage Discharges’ (SSDs), with effect from January 2015, is the yardstick. The standard checking procedure starts off with the question ‘how far is the site from the nearest public foul sewer?’ If more than 30 metres then alternative options can be considered in most cases. If considering pumping to a public foul sewer there needs to be checks regarding the legal rights of access, connection fees, obligations in perpetuity, and the technical aspects of pumping and storage. Package pumping stations are available constructed in glass fibre (GRP) or other materials with pumps of different types.
If a property’s wastewater cannot be connected into a sewer, there are three alternative options: a cesspool, a septic tank or a package treatment plant.
CESSPOOL ISSUES
Under current naming conventions a cesspool is a holding tank that has no overflow and from which all the effluent must be taken away by a licensed tanker firm. Compliance with Building Regulations requires a large capacity tank of several thousand gallons. Even with extreme water saving measures the cost
january/february 2019
of emptying a cesspool is likely to be several thousand pounds in a single year, and so the use of cesspools is therefore best avoided.
SEPTIC TANKS
Septic tanks are much smaller tanks than cesspools with two or more chambers that settle out some of the solids that come into them. However the liquid part remains a strong, polluting liquid that may only be dispersed into a system of soakaway trenches, sometimes also called sub irrigation systems. Soil porosity tests have to be carried out in accordance with BS6297:1983 and the Amendments of 2007 and 2008, and the soakaway system sized and designed accordingly. The trenches need to be constructed with 25 mm-40 mm clean stone to a depth of 400 mm, around a rigid 100 mm diameter pipe with slots or holes at the bottom. The width of each trench is normally 600 mm or 900 mm, and there needs to be a suitable covering sheet. Traditional herringbone soakaways are best avoided as if the main artery blocks the whole system may block. A rectangular grid allows alternative pathways. On sloping ground soakaway trenches should be constructed at a constant depth along one or more contours.
BS6297:1983 requires that septic tank soakaway trenches should only be constructed where there is at least one metre of soil between the soakaway and the water table at all times. This rules out the use of septic tanks in many areas where there is low lying flat ground with clay soil and a high water table.
For septic tanks there may also be a restriction on their use due to underground sources used for extraction of drinking water. In England, check the EA’s Protection Zones or ask a specialist to check this for you. There may also be restrictions with respect to Sites of
Treatment plants with complicated mechanical and electrical
components are now becoming less popular
Special Scientific Interest (SSSI) or similar sites where installation is within or near to such a site.
The discharge of septic tank effluent into a watercourse, including ditches, has been illegal since the 1960s. DEFRA now requires that any existing discharges are stopped by 2020.
Septic tanks should be emptied once per year to avoid failure of the soakaway system.
PACKAGE TREATMENT PLANT Package treatment plants are the modern alternative to septic tanks that produce a clear effluent suitable for discharge into a watercourse if one is available. The effluent is typically 20 times cleaner than that from a septic tank. Most new properties built in the countryside nowadays use treatment plants as they represent the environmentally
www.sbhonline.co.uk 27
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52