This page contains a Flash digital edition of a book.
Manager Practice


smoothly and also that the post-inspection phase is handled as efficiently as possible. You should ensure that you have an open line of communication with your lead inspector so that you can address any immediate issues arising during the inspection and can anticipate when the draft report may arrive. A vital part of securing the right result


for your practice is to ensure that the draft reports are factually accurate. The practice will have 10 working days to consider the draft report and make any factual accuracy submissions to the CQC. The CQC encourage providers to go further than just pointing out minor errors in draft reports; they expect providers to help them publish an accurate and fair report. Therefore, the new template supplied by the CQC invites practices to submit comments about the following:


• Typographical or numerical errors •


Challenges to the accuracy of the evidence set out in the draft report (providing evidence demonstrating the inaccuracy) and also describing any impact on the rating(s)


• Additional evidence which the practice considers should be taken into account in the report.


• Policies undated/without a review date


As for the ‘outstanding’ benchmark in the domain of ‘well-led’, this requires clear evidence of innovation in terms of the manner in which high-quality care is delivered, for example the development of bespoke clinics designed to meet the needs of a practice with a high student population (sports injury clinic, weekly drop-in clinic for patients with mild to moderate eating disorders and an allied CBT clinic). It is also important for the inspectors to find evidence of a clear vision and strategy to deliver high-quality care and for staff to understand this vision and their responsibilities in relation to it.


SUPPORT YOUR STAFF It is clear from reading any CQC report that what staff say to inspectors carries a lot of weight and is frequently quoted in the inspection report. It is important to engage staff in the pre-inspection phase. They should all be clear about what a CQC inspection entails and have a high degree of familiarity with the five key questions and, ideally the key lines of enquiry (KLOEs) that underpin


WWW.MDDUS.COM


the questions. Staff should be supported in this regard so that they feel confident when speaking to inspectors and can present the most accurate information. Well-prepared practices will have a clear idea of the types of questions that the inspectors will ask their staff and will be confident that the responses given reflect the true position of the practice. Most practices will have elements of outstanding and innovative care but these will not feature in the inspection report unless your staff, firstly, recognise these elements as outstanding and, secondly, speak up about them during their time with the inspectors. Starting this dialogue with your staff well in advance of any inspection will generate confidence and improve your chances of securing the right outcome in the inspection reports. You should also engage your patients in the inspection process and encourage them to get involved and have their say.


WORKING WITH THE CQC The relationship you have with your lead inspector will be of fundamental importance in ensuring that the inspection process goes


If the practice is not happy with the ratings proposed in the draft reports and believes these are based on inaccurate findings then this is the time to make these points. In practical terms, it will be too late to raise these issues after the 10-day factual accuracy period has closed. Ratings have been changed by the CQC in approximately 90 per cent of cases where we have supported providers through the factual accuracy process. If used correctly, this stage of the process can therefore deliver real results and those practices who are concerned about the accuracy of the draft reports cannot afford to miss this opportunity to put things right. Where fair and valid concerns have been


raised by the CQC then it is important to respond to these promptly and in a manner which will give the regulator the confidence that the practice can improve and does not need to be subjected to escalating regulatory or enforcement action. Again, the relationship with the CQC will be key at this stage. It can be daunting to face a CQC inspection but the suggestions above should help you to take control of the process and lead from the front.


Ian Cooper is a partner at Capsticks


solicitors, who have recently partnered with MDDUS to provide members with


discounted legal advice on non-indemnity issues (see page 3 for more details)


13


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16