AMRUMBANK WINDFARM


The 288MW Amrumbank West offshore windfarm was announced as fully operational at the end of 2015, with developers E.ON confirming that construction was complete. SeaPlanner was the chosen system provider for the construction phase, which included provision and installation of the marine coordination hardware for the MCC based at Hamburg, Germany.


REAL-TIME PERSONNEL TRACKING This included the coordination of inductions for all personnel working on the site which, by utilising SeaPlanner’s Induction Manager module, could be managed online from any location and therefore ensured site induction and required training was completed before arrival to the windfarm. The benefit of this to the marine coordinators was overall control and visibility of all activities with effective management locally from Hamburg.


A core function of the SeaPlanner system is the real-time personnel tracking system which has both a manual and automated function using RFID swipe cards. All real- time data feeds, movements and actions are stored in the system for quick replay and audit for the lifetime of the project. The system generates a range of custom and standard report outputs to help facilitate daily and ad-hoc reporting.


COMPLETE SETUP AND INSTALLATION


SeaPlanner provided complete setup and installation of marine management and vessel tracking at the central marine coordination centre, as well as the provision and setup of 20 personnel tracking units on various vessels which included iridium satellite communications for data transfer back to the MCC.


ENSURING SAFETY AND EFFICIENCY The SeaPlanner system ensured the safe and efficient coordination of the windfarm which is located off the coast of Germany – 35km north of Helgoland and 37km west of Amrum, by providing software for reliable vessel tracking, personnel tracking and online inductions. Combined with the hardware provision of VHF over IP, CCTV over IP, AIS tracking installed on the offshore infrastructure.


The configuration of the setup allowed the marine coordinators located in Hamburg, to monitor, communicate and control operations of the windfarm site whilst effectively coordinating project personnel from the project ports including Esbjerg, Cuxhaven, Romo and Helgoland.


Throughout construction of the project, SeaPlanner managed and recorded 3,000+ inductions, and the safe transfer of over 76,000 personnel.


SeaRoc Group


Click to view SeaRoc Click to view SeaPlanner


HOTA: The Centre of Excellence for Nationally Approved Training


• Offshore • Maritime • Renewable • ERRV


• RYA • First Aid • Electrical • Health & Safety


For further information contact us on: T


• Firefighting • Emergency Response


‘Providing Quality Training For Over 25 Years’ 01482 820 567 | W


www.hota.org www.windenergynetwork.co.uk 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84