This page contains a Flash digital edition of a book.
Huey P. Long Bridge Project
New Orleans, Louisiana
The Vulcan
®
Barrier from Energy Absorption Systems, a
subsidiary of Quixote Transportation Safety, combines high
Hume Highway Project i-95 Project
speed barrier protection with high performance design.
Whatever the job, and wherever the job, Vulcan Barrier delivers MELBOURNE TO SYDNEY, AUSTRALIA DELAWARE
positive crashworthy protection as a portable steel longitudinal Half a kilometer of Vulcan Barrier Half a mile of Vulcan Barrier
barrier with the necessary flexibility for constantly evolving moved in 15 minutes twice daily moved in 25 minutes twice daily
work zones and lane configurations.
The Vulcan Barrier meets NCHRP 350 TL-3 & TL-4 and EN-1317 H2 & N2 test requirements as a longitudinal redirecting barrier. Easily stackable for storage and
transport, the Vulcan Barrier can be deployed for static and moving work zones and is designed to be used with a variety of end terminal options, including ACZ-350™,
QUEST
®
and QuadGuard
®
. Visit www.vulcanmover.com today to see Vulcan Barrier in action!
SAVING LIVES BY DESIGN
®
© Energy Absorption Systems, Inc.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58
Produced with Yudu - www.yudu.com