ESTIMATING IS PART SCIENCE AND PART ART.


6. Special conditions—Are there special conditions


that For example:


• Is there a large enough staging area for materials to come to the site when needed?


• Is there adequate access to the site, e.g., will you be able to get cranes and other equipment to the site?


• Will there be parking for the construction la- bor or will you need to make arrangements to rent parking spaces, have a shuttle bus or identify alternatives?


• Will you need to pay for room and board for any workers or management?


• Where is the project? Is it in a congested city with no room to lay down materials or no room for the workers to park—or is it in the country with plenty of room?


• Are there restrictions on working hours and if you are a union shop do those hours conflict with the union contract?


There are numerous reasons for asking these questions. Most important, perhaps, is that if some of these items are not considered, you may be the low bidder but would not be able to do the project for the bid amount. Let’s look at one special condition—access to the site—as an illustration of a potential issue that could pro- vide a major curveball to an estimate. Consider as an example, a project I recently worked on.


need to be considered?


THE BEACH HOUSE:


There was an existing building to be demolished and a new building to be erected in about the same location, only bigger, in a beach location. The new building would be on piles. The visit


bridge over a creek leading to the beach. While on the site


reviewing


the situation, we observed a load sign on the bridge that read, “Maxi- mum Capacity 10 Tons.” Ouch! You could not get the heavy equipment over the bridge; you could not get a loaded 18-wheeler over the bridge. Now what? We had to include in the estimate


the double handling of


some of the material onto smaller loads. We ended up delivering heavy equipment (the crane) and material by water and did a beach landing using Vietnam-era landing craft. Had we not done the advance work, we would have severely underestimated the cost of the project.


to the potential site showed a


50


THE WHO’S WHO IN BUILDING & CONSTRUCTION


DISCOVER MORE @ WWW.THEWHOSWHO.BUILD


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208  |  Page 209  |  Page 210  |  Page 211  |  Page 212  |  Page 213  |  Page 214  |  Page 215  |  Page 216  |  Page 217  |  Page 218  |  Page 219  |  Page 220  |  Page 221  |  Page 222  |  Page 223  |  Page 224  |  Page 225