630500
Legend Order limits
Work plan 5 6 7A 7B 8 9
Detail of temporary works Temporary access works Temporary access works within cable route Temporary secondary construction consolidation site
Note: For key plan, please see drawing 6115-532-PA-222
631000
631500
632000 F
Drain FB
6 6
FB FB
Drain Mean High Water 7B FB Mud Pond 7B Drain Drain Drain
5
5
Ramsholt Marshes River Deben ED & Ward Bdy Drain CCLW Drain Drain Drain
FB
7A Mud Mean High Water FB
7A
Drain
Path (um) Drain Drain
Sluice
9
9
Drain
Drain
8
Datum: OSGB36 Projection: OSNG
Project Title
AFPF
Doc ref Date
Author Revision history C 8 630500 631000 631500 632000
C B A
Rev Ref: BDNP_EA1_Red_v22_130821fi, TECV_EA1_TempWks_v21_130823rs, BDNP_EA1_WkPlan_v22_130823rs
27/08/13 26/08/13 23/08/13 Date
RS RS RS By
Order limits and work plans revised Order limits revised First issue Comment
Original A0 Plot Scale 1:1,750
0 50 100
© Crown copyright, All rights reserved. 2013 License number 0100031673
© East Anglia Offshore Wind Limited 2013 150 m East Anglia ONE Offshore Windfarm Order 2013
Work plan: Sheet 09 of 30
Drg No 6115-532-PA-213
Date Rev
Layout
27/08/2013 C
N/A
Volume xxx
Figure XX
East Anglia ONE Offshore Windfarm Work plan: Sheet 09 of 30 5 (2) (j) 2.3
Aug 2013 East Anglia Offshore Wind Limited