627500
628000
628500 Drain Drain Drain Drain Drain Pond Ward Bdy Drain Drain F Cattle Grid
Drain
Drain Track Drain
14 Issues
Drain
Drain Cattle Grid
Drain Drain Drain Low Wood FB Drain Pond
Shepherds Wood Drain
Sluice Farm
Cottages 12 Sluice Farm Issues
White Cottages
13 Track
Track
11
Drain
Datum: OSGB36 Projection: OSNG
Note: For key plan, please see drawing 6115-532-PA-222
Legend Order limits
Work plan 10A 11 12 13 14
Detail of temporary works Secondary construction consolidation site (CCS) Temporary access works
Project Title
AFPF
Doc ref Date
Author
East Anglia ONE Offshore Windfarm Work plan: Sheet 12 of 30 5 (2) (j) 2.3
Aug 2013 East Anglia Offshore Wind Limited Revision history C 627500 628000
C B A
Rev Ref: BDNP_EA1_Red_v22_130821fi, TECV_EA1_TempWks_v21_130823rs, BDNP_EA1_WkPlan_v22_130823rs
27/08/13 26/08/13 23/08/13 Date
RS RS RS By
Order limits and work plans revised Order limits revised First issue Comment
Original A0 Plot Scale 1:1,750
0 50 100
© Crown copyright, All rights reserved. 2013 License number 0100031673
© East Anglia Offshore Wind Limited 2013 150 m 10A 628500
PARK LANE
23.2m
East Anglia ONE Offshore Windfarm Order 2013
Work plan: Sheet 12 of 30
Drg No 6115-532-PA-210
Date Rev
Layout
27/08/2013 C
N/A
Volume xxx
Figure XX
240500
241000
241500
240500
241000
241500
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5