Provision paragraph 11(11)


Schedule 9, Part 3, paragraph 21


Schedule 9, Part 4, paragraph 6


Schedule 9, Part 4, paragraph 11


For “article 32”, substitute For “article 33”, substitute For “article 33”, substitute


“article 33” “article 34” “article 34”


How correction is to be made


Text to be substituted, inserted or omitted


SCHEDULE 2 Non-material amendments Provision Article 2(1) How change is to be made At the appropriate places, insert


Text to be substituted, inserted or omitted


““HVAC” means high voltage alternating current;” ““HVAC offshore wind farm” means a wind turbine generating station with a gross electrical output capacity of up to 750 MW comprising up to 150 wind turbine generators;” ““HVAC option” means the sub-sea export cables in Work No. 3A and the connection works between the HVAC offshore wind farm and the connection point at the existing National Grid Bramford substation by way of a HVAC transmission system;” ““HVDC” means high voltage direct current;” ““HVDC offshore wind farm” means a wind turbine generating station with a gross electrical output capacity of up to 1200 MW comprising up to 240 wind turbine generators;” ““HVDC option” means the sub-sea export cables in Work No. 3A and the connection works between the HVDC offshore wind farm and the connection point at the existing National Grid Bramford substation by way of a HVDC transmission system;” ““onshore HVAC substation” means a compound containing electrical equipment including power transformers, switchgear, reactive compensation equipment, electrical