This page contains a Flash digital edition of a book.
610000


615000


620000


625000


630000


635000 F


C B D E


A


F Legend


Onshore electrical transmissions works and access Alternative route for employee bus movements from/to CCS E


Employee bus movements from/to CCS E


Datum: OSGB36 Projection: British National Grid


Likely employee routes from the strategic highway network to Primary CCS B and Secondary CCSs A and C Route from secondary CCS A to Jointing Pit sites Route from secondary CCS B to Jointing Pit sites Route from secondary CCS C to Jointing Pit sites Route from secondary CCS D to Jointing Pit sites Route from secondary CCS E to Jointing Pit sites Route from secondary CCS F to Jointing Pit sites Route from secondary CCS G to Jointing Pit sites Route from secondary CCS H to Jointing Pit sites


© ESRI 610000 615000 620000


Original A3 Plot Scale


1:80,000


Rev Date By Comment A 29/04/14 GC First issue


Ref:


© Crown copyright, All rights reserved. 2014 Licence number 0100031673. © East Anglia Offshore Wind Limited 2014 Traffic data generated by Royal HaskoningDHV


0 1 2 km 625000 630000


East Anglia Offshore Wind Proposed employee routes for Scenario 1


635000 Drg No 6115-530-PK-072


Date Rev


29/04/14 A


Layout N/A


Volume 2


Figure 27.4


H G I


240000


245000


250000


255000


240000


245000


250000


255000


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7