Table 1 Indicative Offshore project characteristics Parameter
Capacity
Number of wind turbines Offshore Area
Distance from site to shore (midpoint of site to Lowestoft)
Maximum offshore cable corridor length
Maximum offshore cable corridor area Number of export cables (HVDC) 1Proposed wind turbine capacity Wind turbine rotor diameter Hub height Tip height
Minimum clearance above sea level
Indicative minimum separation between wind turbines
Average water depth over windfarm site
East Anglia THREE 1,200MW
120‐240 units 370km2
79km 140km
550km2 Up to 4
5‐10MW Up to 200m
Up to 145m (LAT) Up to 245m (LAT) 22m (MHWS)
In row spacing 750m Inter‐row spacing 750m
Typically 35‐45m
East Anglia FOUR 1,200MW
120‐240 units 359km2
91km 160km
550km2 Up to 4
5‐10MW Up to 200m
Up to 145m (LAT) Up to 245m (LAT) 22m (MHWS)
In row spacing 750m Inter‐row spacing 750m
Typically 25‐40m
1 Note that it is envisaged that more than one wind turbine type and manufacturer will be employed, up to a maximum of three wind turbine models for East Anglia FOUR.
Evidence plan Fish and Shellfish method statement
East Anglia THREE & East Anglia FOUR Offshore Windfarms
September 2013 Page 8
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40