search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
roofing 65


Social housing tennants warm to Kemper System roofing solution


blocks as part of an investment programme supporting a £20 million stock transfer from Gloucester City Council to housing association Gloucester City Homes. Combining Kemper System’s Kempertherm


K


PIR insulation board and the company’s Kemperol V210 cold-applied liquid waterproof- ing membrane, the warm roof upgrades form part of a £29 million 30-year plan, which also includes construction of 100 new social housing dwellings by 2020; the first to be constructed in the city since 1991. Delivered by main contractor, Mears Group,


the improvement works focused on an external upgrade to five tenanted blocks; two on Sweetbriars Street, two on Union Street and one on Columbia Street. All works had to be carried out while the homes remained fully occupied, so the use of Kemper System’s cold-applied liquid membrane was the ideal solution for delivering a


emper System’s Stratex warm roof system has been used to upgrade the roofs of five social housing apartment


robust solution with a BBA accredited service life of 25 years, without causing undue disruption or risk to tenants. Roofing contractor, Rateavon, stripped the


existing metal deck roof of each block and in- stalled a new OSB (oriented strand board) deck as part of the strategy for maximising the service life of the existing accommodation. A Kemper- shield primer was then applied to the roof surface and allowed to cure before the installation of a Kempershield vapour control layer (VCL). Kemperfix adhesive was applied onto the roof


surface and the Kempertherm insulation board was adhered to the roof, using the system’s tongue and groove structure to interlock each piece of board and provide a uniform finish. The Kemperol V210 cold-applied liquid


waterproofing membrane was then applied in a single wet-on-wet process involving the applica- tion of liquid resin to the substrate followed by installation of the reinforcement fleece onto the wet resin. More resin was then immediately applied to ensure complete saturation of the


fleece before the system was allowed to cure to form a durable, monolithic waterproof membrane that cannot delaminate and remains permanently elastic and U/V stable. Comments Stuart Hicks from Kemper


System: “The upgrades to the five blocks form an important milestone in Gloucester City Homes initiative to improve social housing in the city, enhancing existing assets for both current and future tenants and maximising their service life.”


01925 445532 www.kempersystem.co.uk


Enq. 188


Keder Roof XL Bigger. Stronger. Wider. Spanning up to 40m.


Arched or domed structures – lightweight and easy to install with minimal bracing requirements.


Layher UK  info@layher.co.uk www.layher.co.uk Layher Ireland info@layher.ie www.layher.ie


The past, present and future of system scaffolding FS 554413 Approved Training Provider Z-8.22.64 and Z-8-22-64.1 07 P VGS-L 10 Enq. 189 respond online at www.hbdonline.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76