Kemperol membranes put Piccadilly Gate’s roofs back on track


of Kemperol liquid membranes from Kemper System. Piccadilly Gate is home to various Government departments including Education, Ofsted and Highways England. The 125,000sqft building adjacent to Manchester Piccadilly Station was refurbished in a £25 million BREEAM ‘Excellent’ scheme in 2010. Issues with the integrity of the roof had continually plagued the building with leaks, resulting in unsightly staining to the suspended ceilings within. Consequently, the decision was taken to overlay the existing single ply roofing membranes on levels ten, four and three with a cold-applied liquid system from Kemper System. Roofing contractor, Castle Roofing, was appointed to carry out the works and selected Kemper System’s solvent-free Kemperol


T


hree roofs of one of Manchester’s most iconic office buildings have been refurbished with an overlay


roof surface, Castle Contractors applied a primer before applying the resin in a single wet-on-wet process in which the resin is first applied to the substrate; reinforcement fleece is then laid directly on to the wet resin, immediately followed by more resin on top. This ensures complete saturation of the reinforcement fleece. Once cured, the resin forms a seamless, elastomeric waterproof membrane that cannot delaminate, is UV stable and bonds directly to the substrate. For the green roof on level three, Castle


2K-PUR as the most appropriate solution for the level ten roof. The level four roof is above the building’s record-breaking extra-long escalators and leaks from two water outlets had caused staining of the suspended ceiling. This roof was also refurbished as an overlay system, using Kemper System’s Kemperol V210. Having cleaned and prepared the existing


Roofing carried out the refurbishment in two sections, removing half the green roof medium and installing Kemperol V210 onto to the existing surface as an overlay before replacing it and lifting the second section so that the new roofing membrane could be installed. The second section was then re-instated, completing the programme.


01925 445532 www.kempersystem.co.uk


Install with ease! Quality products from the roofing specialist


• A broad range of products designed for ease of handling and installing • Sustainable and high performing products • Comprehensive technical support • Nationwide merchant network


• Keep an eye out for new products coming soon!


18-20 OCT 2016 NEC Birmingham Call us on 01604 433000 or visit our website for details. ADF OCTOBER 2016


www.ubbink.co.uk Stand B4/625


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84