Suppliers – contact list
Design and project management: Beck House Developments 01535 604032
www.beckhousedevelopments.co.uk
Hire equipment: Speedy Hire 0845 600 4509
www.speedyhire.plc.uk
Timber frame: Cartledge
01507 617799
www.cartledgetimberframe.com
Stone:
Bingley Stone 01535 273813
www.bingleystone.com
Paint, stain and hardware: Merritt and Fryers 01756 792485
www.merrittandfryers.co.uk
Windows and doors, staircases, flooring: Magnet
020 7486 8711
www.magnet.co.uk
Kitchen: Howdens
020 7498 9023
www.howdens.com
Building material: Naylor Myers
www.myersgroup.co.uk/nm
Heads, cills and jarms: M and G Stone 01535 600528
www.mandgstone.co.uk
Bath, showers, myson underfloor hearing and all plumbing supplies: Plumb Centre 020 7231 9878
www.plumbcenter.co.uk
All lighting:
Oldfield Lighting 01756 799155
www.oldfieldlsv.co.uk
Carpets:
Carpet Gallery 023 8022 7595
carpetgalleryonline.co.uk
All tiles:
Super Ceramics 01535 600777
www.superceramics.co.uk
Decking: Airedale Tree Surgeons 01535 657263
Hot tub:
American hot tubs
www.americanspas.co.uk
stone which he also used to build retaining walls and garden features. Charlie installed 100 sq m of decking on both sides to create structured terraces and finished with turf and planting. The entire project took 14 months, although Charlie moved into the house a year after build- ing work began. Excluding land and furniture, the build cost
around £150,000. £50,000 of this went into landscaping, £18,000 on the timber frame, £10,000 on windows and doors, £27,000 on electrics and plumbing – including bathroom fit- tings and underfloor heating – and £10,000 on the kitchen. The remainder accounted for build- ing materials and labour. The current value is £375,000. Charlie believes he saved thou- sands of pounds by doing so much of it himself.
“I spend most of my time designing and
building houses for other people so to create a home specifically to my own tastes and needs was really exciting,” says Charlie. “The more time and input you can invest in a self-build, the more you can save. I always build to the highest spec, but when you manage your own build you can fine tune things as you go along and stay in control of every aspect of the process. For me it’s a great house to live in.” But Charlie is moving on. He and his girlfriend
are planning to move to Italy to run a vineyard, although Charlie will still keep his development business up and running. “There will be plenty of opportunities to reno-
vate properties in Italy,” he says, “but the first one I do will be our own.”
selfbuilder & homemaker
www.sbhonline.co.uk 25
Project summary Gross internal floor area: 2,000 sq ft
Form of contract or procurement: Self-build
Overall cost of land: £50,000 Total construction cost: £150,000 Value of property now: £375,000
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68