This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
LIGHTING fluorescent: ____________________________________________ incandescent: __________________________________________ fixture size: ____________________________________________ number of bulbs in fixture: ______________________________ zoned? ________________________________________________ dimmable? ____________________________________________
A/V Site Assessment
OUTPUTS broadcast or cable:______________________________________ satellite:________________________________________________ internet:________________________________________________ assistive listening:_______________________________________ other: __________________________________________________
VIDEO CONFERENCING NEW EXISTING
point to point:___________________________________________ multipoint:______________________________________________ far end 1 location: _______________________________________ far end 2 location: _______________________________________ far end 3 location: _______________________________________ far end 4 location: _______________________________________ isdn: ___________________________________________________ intranet: ________________________________________________ atm:____________________________________________________ data collaboration/t.120: __________________________________ transmission rate: _______________________________________