Judges’ Special Engineering Award


VELODROME LONDON 2012 OLYMPICS ChapmanBDSP


The judges thought this entry was a ‘one-of-a-kind’ project that delivered excellent building performance which, in turn, contributed to outstanding and world-beating performance on the track


Inspired by the creativity and engineering rigour that goes into the design and manufacture of a modern bicycle, the London 2012 Velodrome combines architectural ingenuity and engineering effi ciency. At its heart is the 250 metre-long


cycling track, which drives not only the architectural form but also the environmental strategies for the building. The need for speed on the track means that cyclists like the air to be warm, so it’s less dense, allowing them to go faster. However, spectators require a different thermal environment for their comfort. Even after the 2012 Games, the


Velodrome had to be able to cope with the strict ambient and lighting requirements of televised events (2,000 lux) as well as normal day-to-day amateur training sessions (300 lux). An inventive – yet simple – solution was devised to address these contrasting needs while ensuring the highest degree of energy effi ciency and conservation, and supporting the fi rst-ever High Defi nition broadcast Olympics. With a compact volume, high levels


of thermal insulation, abundant daylight coupled with effi cient artifi cial lighting, integrated natural ventilation and effi cient mechanical ventilation and heating, the Velodrome achieves more than a 30%


reduction in carbon emissions – over and above Building Regulations requirements, even before any contribution from the Olympic Park district energy network is taken into account. Water use is also minimised, with a predicted 75% reduction in potable water consumption. This is achieved by effi cient fi ttings and a rainwater harvesting system that provides 44% of the predicted annual water demand. The Velodrome achieved BREEAM Excellent rating under the bespoke BREEAM assessment developed by BRE for the Olympic venues. The Velodrome is a prime example of integrated design, where architecture and engineering come together to create a building that surpasses sustainability targets, producing stunning architecture ahead of programme and on budget, and delivering world-beating performance both in its construction and on the track.


Extensive computational simulation was used to refi ne the area requirements for air inlets and outlets to achieve the required level of ventilation


PROJECT TEAM


Building services engineer: ChapmanBDSP (formerly BDSP) Building owner/occupier: Lee Valley Regional Park Authority Project manager: CLM Delivery Partner Architect: Hopkins Architects Contractor: ISG


The Velodrome is a building that shows the world-leading attributes of British engineering and


British cycling Hywel Davies, chair of judges


22 CIBSE Journal


www.cibsejournal.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40