Fasteners and Sealing


Coated fasteners among most safety- relevant components of wind energy unit


F


or years wind energy has been the poster child for sustainable energy


generation. Now Eastern Europe is catching up: in Romania the largest onshore wind park in Europe is currently taking shape. The plant installed there incorporates fastening elements coated with micro-layer corrosion protection systems.


In the world of politics the energy transition is a resolved issue. However, complete implementation of the ambitious targets set is still a long way off. Offshore wind energy plants will play a major role in this – and it is precisely here that high- performance corrosion protection systems are required.


Fig. 1. With the Germanischer Lloyd-certified system structure comprising the base coat Delta-Tone and top coat Delta-Seal high-strength fastening elements acquire multi-functional protection in the field of multi-layer coating for wind energy plants.


MKS-Systeme GmbH & Co KG, Herdecke. The company has already received


The coated fasteners installed here are amongst the most safety-relevant components of a wind energy unit. As a consequence, they need to be as maintenance-free as possible in order to achieve maximum possible energy efficiency. The fastener elements in the plants of well-known manufacturers therefore frequently utilise a system structure comprising the basecoat and the topcoat Delta-Tone Delta-Seal of Dörken


various specifications for this system from well-known manufacturers of wind energy plants. This has also been confirmed by Germanischer Lloyd, which recently issued the certificate for the use on standard bolts in wind energy plants in the onshore and offshore fields. The high-strength fastening elements coated with this system, in particular those in the dimension range M24 to M48, have already been successfully employed in gondolas and rotor blade


fastening for many years. Optimal corrosion protection is also required for fasteners in the onshore field, too. Because the largest wind energy units of all are employed onshore. These may reach a height of up to 125 metres, with a rotor span of some 100 metres. The largest onshore wind park in Europe is currently under construction in Fantanele, Romania. The 240 2.5MW wind energy units incorporated there have a nominal output of 600MW. August Friedberg GmbH, Gelsenkirchen, supplies various fastener elements for the wind park, coated with Dörken MKS- Systemen products.


Alongside countries such as Latvia,


Croatia and Switzerland, Romania has long been lagging in the field of wind energy in Europe. With the construction of the Fantanele wind park the country has advanced amongst the front runners. ●


Enter 38 or ✔ at www.engineerlive.com/ede


Dörken MKS-Systeme GmbH & Co KG is based in Herdecke, Germany. www.doerken-mks.com


E


poke A/S is a manufacturer of winter road maintenance equipment in Denmark. Its machines keep airport runways, roads and sidewalks around the world snow and ice-free. Fasteners are essential in keeping Epoke’s machines running properly in harsh conditions. In the past, specialist workers at Epoke lubricated the fasteners manually before assembly to increase corrosion protection. Yet managing the inventory, locating the right fasteners and lubricating them by hand was not the fastest or the most cost-effective solution. With its three-level concept, Bossard provided an integrated solution. The largest benefit resulted from the SmartBin logistic


38 www.engineerlive.com


Fastener coating protects against corrosion system; its automated ordering


process ensures all C-parts remain stocked in the right amounts. As part of the SmartBin solution, Bossard introduced special kit sets with pre-selected fasteners commonly used


together, thus reducing


the time needed to collect parts from different bins.


Bossard’s stainless steel fasteners exhibit no thread galling and the ecosyn- lubric coating protects against corrosion even in extreme conditions.


Use of the SmartBin system and the kit sets have reduced Epoke’s time, effort and costs in inventory management and


production. Bossard’s fasteners with ecosyn-lubric coating eliminate the extra lubrication step during assembly, thus also saving time and money. ●


Enter 38A or ✔ at www.engineerlive.com/ede


Bossard Ltd is based in Zug, Switzerland. www.bossard.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60