Customer Story
Continued from page 8
Infrastructure Management (DCIM) software StruxureWare™
, along with security and
access control. As co-location providers we need this kind of integrated solution — instead of spending our time integrating systems ourselves, we have one provider to do it for us. We can focus on our customers, manage our services, and secure profitability trusting that the integration of our data center systems is taken care of. With its full lifecycle solutions and services — from design, to build, to operate — Schneider Electric is able to provide us with the most solid guarantee for success for our data center project.
Monitor energy use, lower PUE “The Schneider Electric integrated solution included cooling, security and surveillance, UPS, power distribution sub-system, and the Schneider Electric DCIM software, StruxureWare. StruxureWare energy management and monitoring software gives us better visibility to energy use across our operation, allowing us to make more informed business decisions. With the Schneider Electric suite of products, solutions, services, and technology, we are set to achieve energy savings up to 25% and lower PUE to reach the highest efficiency level on the Chinese mainland.
Business wise, future driven™ partnership
“Schneider Electric experts partnered with us from the beginning, even before the design phase of the project. They were concerned
Build > Aquire > Implement
Operate > Maintain > Optimize
Schneider Electric services provided to KDDI
Plan > Prepare > Design
with how we could best succeed in achieving our business goals; to scale investment, optimize operating expenses. Their experts performed a detailed business analysis to provide us with six different design and implementation scenarios based on our requirements: energy efficiency, reliability and availability, as well as sustainability and maintenance, and return on investment.
“We were then able to consider how we could best minimize Total Cost of Ownership (TCO), keeping our data center an efficient one in terms of right-sizing and energy management, now and in the future.”
“
We were able to consider how we could best minimize Total Cost of Ownership (TCO), keeping our data center an efficient one.” – Shinji Miyazawa,
President, Telehouse Beijing BDA Co., Ltd.
SE TV
Check out Schneider Electric TV for an introduction to StruxureWare video!
10 | APC Currents | CALL 888-289-2722 x6000 |
www.apc.com/promo
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28