Page 7 of 52
Previous Page     Next Page        Smaller fonts | Larger fonts     Go back to the flash version

TOUGH • ROBUST • DURABLE • SPECIALIST

One board is all you need!

“With GTEC® LaDura

we were able to dramatically cut the installation time and costs.”

John Stables, Project Manager, BDL

GTEC LaDura: ®

Free web seminar: 19th April 2012

In this tough market environment, finding ways to save time and money on any construction project is a must. GTEC®

LaDura, our strongest ever

plasterboard to date, is proven in doing just this. Its innovative design may remove the need to install a patress, if required, in commercial and residential projects. One layer of GTEC®

LaDura is all you need, and with the

superior sound, fire and impact performance you’ve come to expect. Find out more for yourself by joining our FREE web seminar on 19th April 2012.

Register online at www.gtecladura.co.uk

Previous arrowPrevious Page     Next PageNext arrow        Smaller fonts | Larger fonts     Go back to the flash version
1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21  |  22  |  23  |  24  |  25  |  26  |  27  |  28  |  29  |  30  |  31  |  32  |  33  |  34  |  35  |  36  |  37  |  38  |  39  |  40  |  41  |  42  |  43  |  44  |  45  |  46  |  47  |  48  |  49  |  50  |  51  |  52