Erection Kit
A full erection kit can be provided for assembling and dismantling the structure.
This kit includes all the necessary equipment to erect and dismantle the structure without the need of mechanical plant (crane or forklift truck).
Please note:
This kit is not required if mechanical plant is available on site.
Tool Kit
A full tool kit can be provided for assembling and dismantling the structure.
Based on a build team of four, this kit includes all hand and power tools needed for the erection and dismantling of the structure.
Please note:
A generator or alternative power source is required as this is not supplied within the kit.
This kit is not required if tools are available.
Heating, Ventilation and Air Conditioning (HVAC)
The EFASS range of buildings has been designed to allow the user to heat, ventilate or air condition the hangar.
Structures are supplied with duct inlet points ready for HVAC unit attachment.
Rubb can provide HVAC units if required or the client can use existing units if they are already available on site.
www.rubbmilitary.com
15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20