Products & Services Telephone: 020 7880 6206 Email:
darren.hale@redactive.co.uk University of Lincoln appoints BG Controls for campus developments
Building controls specialist, BG Controls, has been awarded a five-year service and maintenance contract with the University of Lincoln. BG is currently installing and commissioning an integrated heating and access control system on buildings located throughout the city-centre Brayford Pool campus, and on some of the university’s satellite sites across the county. BG Controls has enabled numerous product ranges across all the buildings to interface to one central front end that can be accessed remotely. BG also remotely monitors the system on a daily basis to diagnose and rectify any potential faults and alleviate responsibility from the on-site facilities management team. The technology also automates innovative air source heat pumps, which heat and cool the interiors of Sparkhouse Studios – the university’s start-up business facility – as well as the newly expanded Human Performance Centre. l For more information call 01909 517460 or email
enq@bgcontrols.co.uk
MHS Radiators warmly received
Prysmian launches free guide to BS8519 cable selection
Prysmian has produced a free printed guide to the selection of cable types in accordance with the recommendations of BS 8519:2010. The aim is to help designers, regulators and installers of life-safety and fire-fighting systems identify the correct cables and accessories needed to comply with the new standard. BS 8519:2010 came into force earlier this year and anyone specifying, inspecting or regulating fire resistant cabling should be aware of it. l For your free guide email cables.
marketing.uk@
prysmian.com or call 01238 029 5029
As part of a £1m development to transform a former public house into a luxury restaurant, MHS Radiators has supplied 14 Arc radiators and matching valves to the newly opened Alec’s Restaurant, Bar and Grill, in Navestock Side, Essex. Owner of the restaurant, Alec Smith, said: ‘This restaurant blends contemporary features into a 300-year-old building and we needed radiators that were going to make a bold statement – not shy away into the background. The MHS Arc fitted the bill perfectly. I was really impressed with the high quality of the products supplied by MHS Radiators.’ l For more information visit
www.mhsradiators.com
Fire in hospital chiller sparks safety warning
Titon chosen for new lifeboat station on the Isle of Wight
The new Bembridge RNLI lifeboat station on the Isle of Wight has been fitted with Titon-supplied window and door hardware, including Securistyle’s Defender and Sterling friction hinges, PN’s Combi window hinge system, tri-coated Maco RAIL espagnolettes, and Maco door locks. The high-tech facility was fitted with Iroko timber framed windows because of their strength and durability. Once complete, the new lifeboat station will house the charity’s latest class of offshore rescue boat, The Tamar. l For more information call 01206 713800 or visit
www.titon.co.uk
Clamp-on energy meters gaining favour, says MWA
Clamp-on energy meters are starting to catch the eye of many more customers, says Martin Wardell, managing director of MWA Technology. ‘Our Dynasonics clamp-on meters are fulfilling many vital needs within water, energy, chemical and sewage applications. As a result, clamp-on meters are one of our fastest growing products at the moment,’ says Wardell. ‘The meters, which measure the fluid velocity of liquid within a closed conduit, are very quick and easy to install, saving time and labour costs.’ l For more information call 0121 327 7771 or email
info@mwatechnology.com
70 CIBSE Journal November 2010
www.cibsejournal.com
A fire in the control enclosure of a chiller at a London hospital has highlighted the importance of regular maintenance. Chiller expert, LH, was called in to investigate. Representative Andy Boatwright said: ‘Fortunately, the fire was contained and localised, but it could have been extremely serious.’ LH uses a thermal imaging camera and the ClimaCheck performance analyser to identify ‘hot spots’ in plant and performance issues that cause inefficiency and could lead to future breakdown. l For more information visit www.lh-plc.
co.uk, call 020 8947 0886 or email
andy@lh-plc.co.uk
UNIVERSITY OF LINCOLN
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80