Case Study
Other sources of research included the BCM planning software
of the year category in the CIR annual awards, Continuity Central’s
software list and my own network of contacts. Depending on where
your organisation operates – SME, blue chip, fi nancial, education,
government, etc. – there may be some best of breed tools available
and specifi cally tailored to your industry.
Initially, we used a simple point per function for the preliminary
scoring. This led us to a ‘not so short’ list of 20 products that
potentially could match our ‘must have’ requirements. Once we
reached this stage, we used a more complex weighted scoring
system.
Researching the products
We were very thorough with our product research. Although this
was extremely time and labour intensive, it ensured that we made
sure that the selected product was the best fi t to our predetermined
Building your
requirements. One issue we had to consider was whether to adjust
the requirements at this stage because of the functionality we found
within particular products. We agreed that the requirements at this
resilience is
stage would only be amended where the project board felt that
the function – in hindsight – should have been part of the original
requirement set. As it turned out, this only happened once. ourspeciality
The product research was supplemented with peer review.
We looked through our network of contacts and reviewed the
performance of the products in action. Again online resources such
as Google groups or LinkedIn worked well, given that people have
a greater propensity to complain about a product than to praise it.
Support, help desk knowledge and availability, training facilities,
Emergency Crisis
Business
supporting documentation and company information relating to
Planning Management
trading status and fi nancial performance were all factors taken into
Continuity
consideration in our secondary evaluation criteria.
Test driving the products
Bespoke solutions to meet
At this point we had narrowed our list down to three potential
products. We undertook signifi cant research on the three shortlisted
your continuity needs:
products, two of which we negotiated demonstration versions so
we could test run against our live data – one online version and one
delivered as a local installation. The other vendor allowed us a full