he time of the mechanical engineer is upon us.
According to some experts, it is essential that
this discipline is involved from the start of any
design project to ensure the façade performs
correctly.
So says Sean Affleck of Make Architects: “M&E
specialists are vital for façade design as their early
involvement allows us to integrate the building
services with solid façades.
“A few years ago, structural engineers jumped in
and took the lead, but now it’s [the turn of mechanical
engineers] because the façade is the biggest influence
on the services and vice versa,” Affleck told a recent
Society of Façade Engineering conference.
It is commonplace in Germany for there to be
collaboration between different engineering disciplines
to deliver better façade design, and also for wider use of
façades with integrated heating and cooling systems.
However, this kind of collaboration is a rarity in the
UK despite the similar weather conditions, according
to experts.
John Ahern of the Royal Institution of British
Architects believes the British approach to design is
holding back the wider use of integrated façade. “If you
are going to use an integrated façade you must design
John Ahern of the Royal Institution
of British Architects believes
the British approach to design
is holding back the wider use of
integrated facades
it in from the outset, but because of our construction
process you rarely get services experts involved early
enough,” he says. “It also requires clients to pay more
money up front for more detailed testing early in the
project.”
The planning process is also seen by some as a
hindrance to this approach. It is relatively easy for
the big, signature architects to get planning approval
for something innovative like an integrated façade,
but it is harder for smaller practices to demonstrate
buildability on more run-of-the-mill projects.
The lack of competition in the market is also a
problem as specifiers prefer to be able to compare
suppliers’ products and there are very few integrated
façade systems available in the UK, it is argued.
However, architectural practice Josef Gartner has
been supplying this type of solution to the German
market for more than 40 years. Bernhard Rudolf,
an architect with the firm, points to the success of a
37,600 sq m integrated façade installed in the BMW
???????
World building in Munich. This steel frame façade
includes heating, sprinklers and electrical services.
He says this type of curtain walling can deliver
better heat and cool-air distribution, as well as more-
even temperatures across the occupied space because >
www.cibsejournal.com April 2009 CIBSE Journal 39
CIBSEapr09 pp38-40 facade.indd 39 2/4/09 15:00:59
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68
Produced with Yudu - www.yudu.com