Buildings Iconic
Excellence embodied
start,” says project director Chris Lynn (below, left). integrating the units into the building fabric in order to
“On some projects the BREEAM assessor can be rather maintain the high quality chic designs of the roof and
We took
passive with a tendency not to get too involved in some west elevation façade of the building. Biomass fuel was
of the key design decision-making. also considered – but discounted due to concerns over
the BREEAM
“We took a very different view and involved our in- the reliability of a local fuel supply.
issue on
house sustainability consultants from day one. They “There are some projects where clients wish to
board right
were instrumental in influencing the conceptual include renewables as a visual token gesture even
thinking of the design team and held workshops to though they may bring very little real practical added
from the start
communicate the key elements for consideration. In value,” explains Lynn. “In contrast, the university took
and involved
this way sustainability was always a high agenda item a very honest view and was adamant that renewables
our in-house
and integral to every design decision.” should only be included if they offered real added value
There was also an aspiration to exceed the and benefits to the project.
sustainability
requirements of the current Building Regulations Part “The simplicity and effectiveness of the integrated
consultants
L by at least 10 per cent. In the event, the design has design solutions negated the need for renewables.
from day one.
achieved a 14.5 per cent improvement on Part L through However, the design does include some provision for
simplicity of design and avoiding the need for renewable future retrofitting of renewables, if required.”
They were
energy sources to meet the targets. A further limitation was the wedge-shaped site for
instrumental
The decision about renewables was only taken after the campus, which restricted the building orientation
in influencing
Faber Maunsell undertook a detailed feasibility study. options. To address this issue Faber Maunsell carried out
For example, use of ground source heat pumps was many iterations of dynamic thermal analysis modelling,
the conceptual
considered, but there was a danger of causing damage using real weather data to model the temperature
thinking of
to existing underground ties running from the river’s profiles of all internal spaces. The company then worked
the design
retaining bank wall. Similarly, solar thermal heating closely with architects Building Design Partnership
was not deemed appropriate, due to the high cost of (BDP) to arrive at a design that would achieve the right >
www.cibsejournal.com February 2009 CIBSE Journal 47
CIBSEfeb09pp46-50 newport•.indd 47 5/2/09 14:22:11
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88