search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
more news at www.heavyliftpfi.com


INDUSTRYINSIGHT Being a massive archipelago,


the region’s ports are a crucial part of the logistics landscape. Berninet said CMA CGM has built strong relationships with the region’s container terminals. “Kingston Freeport Terminal is ideally located at the heart of our Caribbean network, and offers a lifting capacity up to 75 tonnes; Cartagena SPRC/CONTECAR can handle up to 165 tonnes in a tandem lift; MIT Panama is able to consider loads up to 180 tonnes; and in Trinidad we can access the use of a 500-tonne capacity truck crane.” He added that, by and large,


A shipment of wind turbine blades from Marseille (France) to Saint John’s (Antigua).


CMA CGM optimistic about Caribbean project prospects


The Caribbean region comprises some 700 individual islands that are politically, economically and geographically diverse. David Kershaw discusses the region’s prospects, and pitfalls, with CMA CGM – a container shipping giant that is increasingly targeting heavy and oversize cargoes.


S


téphane Berninet, head of CMA CGM’s project cargo division, highlighted that


the shipping line has a longstanding presence across the Caribbean, and it has been strengthening its regional project cargo team in the area. “We have enjoyed strong


growth by securing various spot project cargo shipments, both intra-Caribbean as well as to and from other regions,” he said. “In the Caribbean region, we are currently operating ten


intra-American and feeder services, coupled with eight main liner services from North Europe, the Mediterranean, Asia and the west coast of South America. ” The 2,300-10,000 teu ships connect to each other in Kingston (Jamaica), Cartagena (Colombia) and Port of Spain


28 January/February 2020


(Trinidad), providing clients with multiple weekly departures and ready availability.


Healthy business Given the region’s geopolitical and economic diversity, Berninet said each individual country moves to its own rhythm, with pockets of opportunity arising. “Our project cargo teams, mainly the ones based in Miami and in our head office in Marseille, are keeping very busy,” he said. “Cargo traffic from the US East Coast to the Caribbean remains healthy, with out-of-gauge


volume increases to the whole region, particularly in the construction, energy and mining


sectors, from yellow goods and construction machinery (cranes, dumpers, lift trucks), and heavy transformers to XXL tyre supply for the mining industry. The leisure and commercial boats segment is also substantial. “On the eastern part of the


Caribbean, both the oil and gas and the aerospace industries are instrumental to our project cargo business. Intra-Caribbean cargoes are also continuously developing.”


We have enjoyed strong growth by securing various spot project cargo shipments, both intra- Caribbean as well as to and from other regions. – Stéphane Berninet, CMA CGM


its terminals are “extremely supportive, and our processes ensure that these operations are prepared in detail and are closely monitored. The track-record in terms of regularity, reliability and safety speaks for itself.” Nevertheless, he said the


region’s terminals need to invest in proper lifting equipment to position themselves for what comes next in terms of non-containerised cargo, heavy lift and oversized cargoes, while maintaining a focus on efficiency, productivity and operational excellence.


Recent projects Among recent projects, CMA CGM has moved transformers from Cartagena (Colombia) to Paramaribo (Suriname); a mining truck from Caucedo (Dominican Republic) to San Antonio (Chile); wind turbine blades from Marseille (France) to Saint John’s (Antigua); motor boats from Antwerp (Belgium) to Cartagena; and a pilot simulator from Jebel Ali (UAE) to Puerto Cabello (Venezuela). “Overall, we are very


optimistic about prospects for 2020,” added Berninet. “CMA CGM’s edge, as a


container liner, is to provide numerous and regular services crossing each other in the region, as well as having


feedering services ... including long-term schedules to plan shipments well in advance.” HLPFI


www.heavyliftpfi.com


CMA CGM


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146