633500
Legend Order limits
Work plan 3A 3B 3C 4 5
Detail of temporary works Temporary access works Temporary access works within cable route
Note: For key plan, please see drawing 6115-532-PA-222
634000
634500
635000 F
11.3m Drain
2 1
Path (um)
Bawdsey Hall 11.0m
Shingle Pond
Drain
FERRY ROAD
Pond Track 10.5m Path (um) Track
4 Drain 3C FB
Bawdsey Cliff
Track
Drain 43 4.7m Drain 5 46 Drain Sub StationElectricity Path (um) 3B
Drain
Shingle Mean High Water Mean Low Water 4.9m
Drain
FB 3A Middle Barn
Drain
Datum: OSGB36 Projection: OSNG
Drain
Shingle Drain
Project Title
AFPF
Doc ref Date
Author 633500
East Anglia ONE Offshore Windfarm Work plan: Sheet 06 of 30 5 (2) (j) 2.3
Aug 2013 East Anglia Offshore Wind Limited 2.6m Revision history C 634000 634500 635000
C B A
Rev Ref: BDNP_EA1_Red_v22_130821fi, TECV_EA1_TempWks_v21_130823rs, BDNP_EA1_WkPlan_v22_130823rs
27/08/13 26/08/13 23/08/13 Date
RS RS RS By
Order limits and work plans revised Order limits revised First issue Comment
Original A0 Plot Scale 1:1,750
0 50 100
© Crown copyright, All rights reserved. 2013 License number 0100031673 © East Anglia Offshore Wind Limited 2013
150 m East Anglia ONE Offshore Windfarm Order 2013
Work plan: Sheet 06 of 30
Drg No 6115-532-PA-216
Date Rev
Layout
27/08/2013 C
N/A
Volume xxx
Figure XX
FERRY ROAD
4.2m
239000
239500
239000
239500
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5