search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
COVER STORY


power for the day-theatres at Crawley General Hospital,” says Brunton. “It required all our experience and engineering knowhow to devise and deliver a solution that met their urgent requirements and could be accommodated on the site. “Our ability to engineer a modular medical IT system, configuring the equipment to fit into the cramped space available was a vital factor in achieving the customer’s aims. A standard, out of the box system simply could not work within the confined location.” Within the same limited space, the engineering and installation team designed and commissioned two bespoke UPS-backed distribution boards equipped with Residual Current Monitoring technology (RCM), which feed general lighting circuits and other non-medical loads. Incorporation of RCM technology avoids the need to shut down when carrying out periodic inspection and testing, delivering huge operational and financial benefits in terms of reduced downtime and disruption. The system incorporates the


COMTRAXX MK2430 universal remote alarm indicator and test combination. The remote alarm units provide each theatre with a visual and audible indication of alarm messages from Bender systems, including medical IT and RCM data. It allows messages from third party


systems to be recorded and displayed on the MK2430, for example from medical gases or UPS systems, and enables testing of the IT system monitoring equipment using a programmable button.


Modular to the max Bender UK also played a key role in what could be seen as the ultimate application of modular principles to provide medical facilities – a complete self-contained operating theatre manufactured offsite and delivered by ModuleCo Healthcare to the Royal Lancaster Infirmary. The new £2.5m, state-of-the-art


operating theatre and recovery area is equipped with a safe and resilient medical IT critical power system, along with theatre equipment including Merivaara LED operating lights, services pendants, theatre touchscreen control panel and a PACS viewing screen supplied by Bender UK. The medical IT system was incorporated into the new modular unit, together with a battery-back-up UPS system. The building was delivered in sections


and craned into place on a prepared site adjacent to the existing operating theatres. It will provide extra capacity while the operating theatres are refurbished and will be integrated as part of the permanent surgical facilities once the upgrades are complete. Bender UK also partners construction


16


Assembly of modular healthcare facility at Hillingdon Hospital.


and engineering company MTX and most recently supplied medical IT and UPS systems for an evolving three-storey, 70-bed modular unit at Hillingdon Hospital in north-west London. The unit – consisting of a 28-bed decant unit, a 26-bed respiratory unit and 16-bed ICU facility – is due to be handed over in early 2021.


Hillingdon Hospital is an acute and


specialist services provider to its local population and also provides emergency services to Heathrow Airport as the nearest hospital. It is operated by Hillingdon Hospitals NHS Foundation Trust, which in July 2020 announced proposals for a new hospital to be built on the site.


A modular building was therefore a prudent choice by the Trust to accommodate a decant ward to receive patients from other areas of the hospital, a respiratory unit so essential in dealing with COVID-19 patients, and an intensive care unit. The building can be rapidly deployed to provide additional facilities and will also offer additional flexibility as the plans for the new hospital progress. MTX, which specialises in delivering


innovative and sustainable solutions to the public and private sectors, was initially tasked by the NHS Trust to deliver a single storey, 28-bed ward with the facility to go multi storey in the future. However, due to the pandemic the initial single storey building was accelerated with the additional two floors added to the contract within four weeks and therefore installed immediately after the ground floor during the COVID-19 quarantine/lockdown period. The urgent need for the building


was one of the drivers for Bender UK’s modular-build Group 2 medical IT system that has the potential for a shorter lead time, in addition to offering more flexible configuration within the evolving facility. Working closely with MTX, the team


developed integrated medical IT and UPS solutions for each floor of the unit. The original ground floor facility


requirement was for 6 x 10kVA medical IT systems incorporating ATICS rapid changeover for added resilience, with programmable remote alarm panel and a pair of 60kVA Multi Sentry UPS units with batteries rated at 40kW for 60mins. The first floor required 8 x 10kVA and


4 x 6kVA medical IT units with remote alarm panels, and the second floor 6 x 10kVA medical IT units with remote alarm panels, all backed by a UPS system comprising of a pair of 125kVA units with batteries rated at 125kVA for 60 minutes. These UPS systems were supplied, installed and commissioned by Constant Power Services, one of Bender UK’s leading UPS partners in healthcare.


Conclusion The worldwide COVID-19 pandemic has seen an increasing focus on healthcare facilities and in particular those providing critical and intensive care. The drive to re-task existing areas, or upgrade facilities in often ageing health estates requires a flexible approach to those tasks and an ability to solve problems. It is a timely reminder that the basic principles of engineering – to invent, design, analyse, build and test complex systems to fulfil functional objectives and requirements – underpin the ability to provide flexible engineered solutions for healthcare facilities.


Bender UK Low Mill Business Park Ulverston, Cumbria LA12 9EE Tel: 44(0) 1229 480123 Fax: 44(0) 1229 480345 Tel: +353 1 5060611 www.bender-uk.com


IFHE DIGEST 2021


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116