COVER STORY


solution was essential to urgently upgrade the power supply for four operating theatres in the day-surgery unit at Crawley Hospital, which are the responsibility of Surrey and Sussex Healthcare NHS Trust. When the unit was originally built it did not require a medical IT power system, but the technology was essential to meet current standards for critical power. The Crawley Day Surgery Unit is


located on the first floor of the hospital’s Red Wing, and the compact modular medical IT/IPS system was built into an area close to the theatres. Bender UK devised an engineered


70-bed modular unit at Hillingdon Hospital houses three wards. That is certainly the case at Bender UK


where problem solving, innovation and invention is part of its DNA, and its engineered solutions have placed that capability at the forefront of the company’s market offering for critical power systems used in Group 2 medical locations including operating theatres, intensive care units and high dependency facilities.


Medical IT/IPS (isolated power supply)


systems are invariably paired with uninterruptible power supply (UPS) systems. Originally supplied only in large cabinets to be lifted into place during construction phases, these products have been developed as ‘modular’ solutions that are more flexible to configure. “We take pride in our ability to engineer hospital-specific solutions for our customers – whether that is fitting equipment into almost impossibly difficult spaces or thinking ‘outside the box’ to conceive an affordable and sustainable solution that goes beyond the physical confines of the building in which the facilities are located,” says Bender UK managing director Gareth Brunton. The company’s engineering capability


has played a key role in completing many high-profile healthcare projects and includes future-proofing the medical IT power system designs and UPS systems to accommodate extra power requirements of new and emerging critical care technology. Brunton adds: “We currently support


over 400 hospitals in the UK and Ireland and offer the benefit of our wealth of knowledge, experience and engineering expertise that ensures we provide safe and highly resilient critical power solutions. That is coupled with our advanced clinical equipment solutions for all Group 2 medical locations


IFHE DIGEST 2021


including theatres, intensive care units (ITU/CCU/HDU/ NICU/SCBU etc.), imaging areas and resuscitation areas within emergency departments.


Delivering under pressure Seamless continuity with partners has been evident throughout the COVID-19 pandemic during which the company has played a vital role in extending and maintaining care facilities. “During the creation of the Nightingale Hospitals across the country we were the go-to company for delivery of critical care UPS power systems of huge magnitude in very tight timescales when the pandemic was in its rapidly evolving stages. The modular principle of our UPS designs enables us to respond to urgent need with flexible and scalable solutions.” The ability to provide an engineered


solution to fit the equipment into the limited space where standard, off the shelf electrical panels simply could not be accommodated. To achieve the solution components were separated out and placed in close proximity to the boards to ensure full functionality. However, with existing buildings


already at capacity, there was simply no space to accommodate the larger footprint modular UPS system that was also required. Uninterruptible power specialist Centiel UK was brought in and together we developed the plan to install modular UPS equipment in a glass reinforced polymer (GRP) building to be craned into position on a specially reinforced flat roof adjacent to the theatres, with cables linking them. The project took just eight weeks to


complete from the approval of drawings to full commissioning of the medical IT system serving the critical care facilities, and the UPS system within the new GRP structure. Craning the GRP onto the reinforced flat roof was achieved in a single day, minimising disruption to the busy hospital site. “The Trust had an urgent requirement for a new medical IT system to upgrade


Modular uninterruptible power supply. GRP enclosure lifted into position. 15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116