search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
UK POWERNEWS


November - December 2018


SUMMER 2016 PROMOTING STANDBY POWER & COGENERATION Adel Syst


tems Intelligen – main


ellig gent Battery C – maintaining the batt • Wide input range 90-305V AC


• Single 12 or 24V DC output or 12/24V up to 35A -12V DC or 20A 24V DC


• MODbus or CANbus communication options available - can be used with the ADELview software


• Door mounting full colour interactive LAN/WEB enable display DPY351


• Intelligent Battery Charger sensing the charge requirements of the battery – Trickle, Boost or Recovery


• Selectable battery types so the correct charge voltage per cell is applied


GENSET FOR KENNINGTON TUBE STATION: Power Electrics provided a bespoke generator and hybrid setup for theTube Station in S. London.


Page 18 Arsenal has installed a


battery storage system (BSS) capable of holding enough energy to run Emirates Stadium from kick-off to full time, thanks to a unique collaboration with Pivot Power – with funding from Downing LLP. The 3MW/3.7MWh BSS,


one of the largest at any sports ground in the world at present and the first at a UK football club. Installed by Pivot Power in the basement of the stadium, it will have further storage capacity added in summer 2019. Pivot Power will operate the BSS for 15 years. The 3MW BSS has been


designed to meet Arsenal’s peak consumption and will store enough energy to run the 60,000-seater Emirates Stadium for an entire match. It could power up to 2,700 homes for two hours - more than enough time to watch the match at home. The battery provides a


Downing LLP partners with Pivot Power to install battery storage system for Arsenal Football Club


range of services of the kinjd which will support the UK’s transition to a low-carbon economy. It provides flexible capacity that assists the electricity network in using more renewable energy. It also helps to support the growth of clean technologies like electric vehicles and heat pumps. This marks a further step


in Arsenal’s sustainability programme, having already become the first Premier League club to switch to 100% green electricity.


Pivot Power CEO Matt


Allen added: “Arsenal is showing how football clubs and other big power users can save money and support the UK’s climate change and clean air targets.” He says: “Batteries are


central to creating a cost- effective, low-carbon economy and we are keen to help government, local authorities and businesses seize the opportunities they offer.” Downing LLP is also


providing key investment in a nationwide network of 50MW grid-scale batteries and rapid electric vehicle charging SuperHubs, developed by Pivot Power. It has received planning permission to install batteries on the first two of 45 sites connected to National Grid’s extra-high voltage transmission system, at Southampton and Carlisle.


UK PowEr NEwS NoVEMBEr - DECEMBEr 2018


Reich Couplings Driving Power Generation


Your drive is our strength - Your strength is our drive


Stationary power generators De-centralised power systems


Biogas and natural gas applications for permanent, temporary or emergency power supplies


WHISKY GALORE: Case Study: Clearfleau completed a new biogas plant for Diageo at its Glendullan distillery on Speyside, Scotland.


Page 20 y Chargers main taining the bat ttery f for when y you need it


• Variable charge current to match the correct charge rate for the battery bank


• Automatic protection function against 8 common battery fault conditions


• Battery charger check at the end of a charge cycle • Battery health check every 90 minutes when the AC is present


• Options for temperature compensation probe to regulate the charge voltage versus temperature


• Housed in aluminium case for DIN rail mounting


Tel: +44 (0) 1206 575755 Em


e Email: sales@t V 143


143 Butt R O


3 Butt Road, Colchester CO3 3DP Essex, United Kingdom


SUPER LOW LOSS AMORPHOUS TRANSFORMER REPLACEMENT Smurfit Kappa’s Stalybridge site gets a wilson e2 transformer, saving in excess of £10,500 per annum.


Page 26


el: +44 (0) 1206 575755 mail: sales@tvri.co.uk www.tvri.co.uk TVR Instruments Limited


Reich ARCUSAFLEX Coupling


Highly fexible rubber disc couplings for Diesel & Gas engines


Reich TOK Coupling


Highly flexible couplings for flexibly mounted engines


Unit 4 Bankside Business Park Cor PLEASE


PLEASE VISIT WWW.REIC


Unit 4 Bankside Business Park Coronation Street S    | info@r


 | info@reich-uk.com TWWW.REICH-UK.COM F


CH-UK.COM FOR MORE DE


eet Stockport SK5 7PG MORE DETAILS


K5 7PG


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36