This page contains a Flash digital edition of a book.
News


Technal Façade Systems for new riverside School campus A


series of architectural aluminium glazing systems from Technal has been used for an ambitious redevelopment project at Yarm School, an independent co-educational private day school near Stockton-on-Tees.


Designed by Associated Architects and built by Miller Construction, a range of new facilities has been added to the senior school campus, enhancing the quality of the riverside and providing state-of-the-art accommodation to reinforce the school’s reputation in the region. The centrepiece of the development is an academic block overlooking the River Tees, housing high specification classrooms and studios for drama, dance and music. An 800-seat auditorium has created an outstanding venue for performing arts in the area.


A double height entrance foyer for the auditorium maximises the beautiful views over the river and was created using Technal’s GEODE-MX Visible Grid curtain walling. The system was also used for the dance studio, classrooms and corridors, filling the building with natural light. The GEODE-MX SG Mechanical option was selected for the music room – this system allows a flush glass façade and less visible aluminium. Technal’s FXi46 window system delivers high levels of natural ventilation throughout the project. Large bays of four side hung casements were inserted into the curtain walling and interspersed with western red cedar panels for the classrooms, with top hung windows and


integrated rendered panels specified for the dance studio. In the corridor areas, the windows are electrically operated top hung systems, with contrasting enamel-stoved glazed spandrel panels also inserted into the GEODE curtain walling. According to the Project Architect, Barbora Bott at Associated Architects, “A key design element for the glazing was to achieve large spans with minimum sight lines to allow extensive daylight penetration and reduce artificial lighting. We were also looking for robust, low maintenance aluminium systems with good U values, visual consistency across the project, a high standard of aesthetics, and value for money.”


“Technal’s façade products achieved all these criteria and have met our expectations. As a result, we would consider specifying them for other projects.”


Specially-designed restrictors were used for the windows to the classrooms, and the position of the window handles was adjusted for the office areas on the east elevation, to allow easy opening of the windows which spanned floor to ceiling height. All Technal’s systems were finished in dark blue-grey to complement the palette of materials selected for the building envelope – white render, western red cedar horizontal panels, anodised aluminium perforated rainscreen panels, and pre- weathered zinc cladding.


Low energy features of the project include a ground source heat pump to provide under floor heating throughout; solar panels to pre-heat


water for changing rooms and toilet facilities; high efficiency gas boilers; high level brise soleil sun shading to reduce solar gain; heat recovery ventilation, and plenty of natural light. The GEODE-MX Visible Grid system can be used to create flat or faceted façades up to 20° and can accommodate large spans of 6mm to 32mm glazing. It is engineered for excellent thermal performance to achieve low U values, and slim, constant 52mm sight lines for the mullion and transoms give a uniform appearance across the GEODE suite. Other options include concealed vents for natural ventilation whilst maintaining an uninterrupted flat façade, GEODE- MX Trame for horizontal or vertical emphasis, structural, beaded, acoustic and sloped glazing.


u01924 232323 uwww.technal.co.uk


Institute appoints new Chairman of the Board T


he Institute of Contemporary Music Performance is delighted to announce the appointment of Professor Dan Howard as Chairman of the Board of Directors. Having studied at the London School of Economics and worked in a variety of commercial sector roles, Professor Howard has spent 25 years working in academia – Plymouth and Bournemouth Polytechnics, the University of Gloucestershire (as Dean of the Faculty of Media, Art and Communications) and latterly Birmingham City University (as Executive Dean leading all Performance and Media, including Birmingham Conservatoire, Birmingham School of Acting, Birmingham Media School and English). Having retired from BCU at the end of 2012 he has been working in a number of diverse roles, including Chair of Governors at Hereford College of Arts and the Sir Michael Balcon project in Birmingham.


As Chair of the Board of Directors at the Institute, Professor Howard will contribute significantly to the strategic leadership and direction of the organisation. Paul Kirkham, Chief Executive at the Institute, commented:


“We are delighted that Professor Howard has accepted this role, as he will bring considerable knowledge, experience and wisdom from a wide range of professional and academic roles that will benefit all Institute stakeholders, not least our students. This appointment is part of our long-term strategy to continuously develop a world-class governance structure for the organisation. The Institute is already a well-established and well- respected provider of education, being a subscriber to the QAA, holding ‘Highly Trusted Sponsor’ status with UKVI and having courses designated for student funding by the Department for Business, Information and Skills. With a senior leadership team comprising individuals of the stature and capability of Professor Howard, we feel confident that we will continue to overcome the challenges facing an independent provider such as the Institute while taking a leading position in the further development and progress of the sector as a whole.”


14 www.education-today.co.uk May 2014


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40