ADVERTORIALCOORDINADORA


COORDINADORA´s team working at the Port of Gijón, Spain.


ETM: A new type of project forwarder?


As the traditional activities of project freight forwarders have evolved, COORDINADORA has embraced the wider scope with its Engineered Transport Management (ETM) concept.


evolved over the last decades to encompass an increasing number of associated tasks that, although necessary for the execution of the transport project, do not clearly fall in what it has been normally considered as transport activities. Examples of these are the assessment of


E 72


adequate of routes; pre-engineering studies of viability; supervision by qualified personnel (increasingly engineers) along the important stages of the transport project; basing of qualified personnel at customer premises; detailed engineering; increased


May/June 2019


ngineered Transport Management (ETM) is a concept that comes to define a new stage in the evolution of what is traditionally known as project forwarding.


The classic role of a project forwarder has


risks assumptions; necessity of safety certification for all the attending personnel; design and fabrication of transport accessories and tools; management of a large range of suppliers; as well as the storage/yard selection and management. This has meant that the contracts


between the customers and suppliers have also evolved. For many large shippers, particularly


EPCs, the traditional role of a project freight


forwarder is no longer regarded as a simple intermediary. The addition of value to the supply chain is in high demand and large customers expect a project freight forwarder to be the authority in the field, covering a wide range of complementary tasks as part of their scope, and taking full responsibility for them.


Lighter cargo projects However, the concept is also applicable to lighter cargo projects where the complexity of a project covers all processes, including the planning, pre-emptive cost and operational control, negotiation of contracts, optimisation of timing, accurate information, commitment to schedules, and focus on HSE performance. This concept is simple in theory, and, in many cases, most players in the market use this as their mission statement. In reality, however, this is not as common as first thought – from the shipper’s perspective, at least. Through listening to our customers,


COORDINADORA has embraced this challenge and accepted that a modern


www.heavyliftpfi.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166