TABLE OF CONTENTS GUIDELINES FOR SPECIFICATION INTEGRITY
OVERVIEW
I FOUNDATION ELEMENTS FOR BUILDING A QUALITY SPECIFICATION II ACTIONS IN THE PROJECT’S DESIGN PHASE(S)
III ACTIONS IN THE PROJECT’S CONSTRUCTION DOCUMENT PHASE IV ACTIONS IN THE PROJECT’S BIDDING PHASE V ACTIONS IN THE PROJECT’S CONSTRUCTION PHASE VI ADDITIONAL CONSIDERATIONS FOR SPECIFIC PROJECT TYPES VII ADDITIONAL CONSIDERATIONS FOR INTERNATIONAL PROJECTS VIII SPECIFICATION APPROACHES IX TERMS
3 4 8
10 12 13 14 15 17 21
COPYRIGHT 2009 BY THE INTERNATIONAL ASSOCIATION OF LIGHTING DESIGNERS. ALL RIGHTS RESERVED. MATERIALS MAY NOT BE REPRODUCED OR TRANSLATED WITHOUT WRITTEN PERMISSION.
2
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28