under 1000 have either had or will have existing appliance modified or a like for like (cast iron) new appliance fitted. 180 stainless steel "off the shelf" units are to be installed of two standard designs depending on main supply pipe orientation. 100 are already in - mainly to replace poor installations. The stainless units look different, but are sturdy enough. if installed properly they should be around 700mm above ground level. They should be installed with security chains on the locks. If theft occurs we can fit anti bolt cropper chains. The total project cost is around £500k and would have been a lot more if we have not used the stainless steel units. The taps ensure there is less chance of cross contamination and fewer freezings. Stop taps mean problems easier to solve without shutting down large areas.


05/03/2013 Boom on the River Slea


After some discussion CRT chose not to install a boom on the Slea this year.


05/03/2013 ‘Could be gold money boxes’.


CRT are working with a college and have 3 collections boxes on trial. The most popular will be adopted and used throughout the country.


05/03/2013 Fishing at West Stockwith basin


Forwarded details to the moorings team to see if a solution can be found.


Asked if the location of angling opposite the linear moorings at West Stockwith could be reviewed.


05/03/2013 Sewage into the canal at west stockwith


Reported that a waste surveyor had been to the site but he was unable to pinpoint the exact source and so no action has been possible as yet. No progress since.


10/10/2013 Works Update Chesterfield Canal


Weed Removal. Have finished channel weed removal and will be spending the next few weeks concentrating on the encroaching reeds. We’ve had far fewer comments complaints this year than other years.


Currently on site at Whit Sunday Pie Lock carrying out coir roll works to protect the bank from erosion. Ultimately parts of this section will be dredged as well as the towpath being slightly widen.


On site relaying lock slabs at Turnerwood Double bottom Lock.


Works have been carried out to the down side approach moorings at Whit Sunday Pie Lock.


Carried out Works to an undermined approach mooring wall at Forest Middle Lock


Had a short stoppage at Morse Lock to replace the fendering and paddles


Improved the sluice door at the canche feeder in Worksop, improving operation.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28