30%* off your data centre’s energy bill is just the beginning
Imagine what we could do for the rest of your enterprise
Saving up to 30% off your data centre’s energy bill is no small feat, and as energy prices continue to climb, every watt of energy you save matters. But data centres don’t operate in a vacuum; they support and are supported by systems—process, HVAC, and security, to name a few—that also require vast amounts of power.
Enterprise-wide energy savings Today, only EcoStruxure™ energy management architecture by Schneider Electric™ can deliver up to 30% energy savings to your data
centre...and beyond, to the entire enterprise. Reducing data centre energy costs by up to 30% is a great beginning, and thanks to EcoStruxure energy management architecture, the savings don’t have to end there.
Download the White Paper, ‘Allocating Data Centre Energy Costs and Carbon to IT Users’, and get a chance to WIN a Lenovo®
Visit
www.apc.com/promo Key Code 77613v • Call 0845 0805034 • Fax 0118 903 7840
Active Energy Management™ architecture from Power Plant to Plug™
Industrial plants Open standard protocols allow for system- wide management of automated processes with minimized downtime, increased throughput, and maximized energy efficiency.
Buildings
Intelligent integration of security, power, lighting, electrical distribution, fire safety, HVAC, IT, and telecommunications across the enterprise allows for reduced training, operating, maintenance, and energy costs.
all-in-one touch screen PC! Data centres
From the rack to the row to the room to the building, energy use and availability of these interconnected environments are closely monitored and adjusted in real time.
30%
©2011 Schneider Electric. All Rights Reserved. Schneider Electric, APC, EcoStruxure, Active Energy Management, and Power Plant to Plug are trademarks owned by Schneider Electric Industries SAS or its affiliated companies. All other trademarks are property of their respective owners. APC UK - Unit 1, Ground Floor, 250 South Oak Way, Green Park, Reading, RG2 6UG 998-2760_GMA
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64