This page contains a Flash digital edition of a book.
GLASS REHAU GENEO®


The East Midlands regional office for Interserve Construction Limited in Syston, Leicestershire is the first Zero Carbon office in the UK to be fully certified to Passivhaus standard.


In air tightness tests, it achieved an air


change rate of just 0.44 per hour @ 50 Pa, well within the Passivhaus limit of 0.6.


Much of this air tightness can be attributed to the use of Passivhaus certified REHAU GENEO®


triple glazed windows and


external doors throughout the building, fabricated and installed by Solar Windows.


27 windows and four doors were fabricated for the £1.5m, 680m² office, the majority of which were installed across its south facing aspect to increase solar gain in winter and minimise the requirement to generate additional heat.


The new 86mm REHAU GENEO® window is manufactured using the 100% recyclable RAU-FIPRO®


fibre composite


material, which is similar to the kinds of fire composites already used extensively in aircraft construction and Formula 1 design.


system to perform without any requirement for steel in standard sized windows, eliminating the thermal bridges


The inherent strength of this material enables the six chambered REHAU GENEO®


The new 86mm REHAU GENEO® RAU-FIPRO®


WINDOWS INSTALLED IN PASSIVHAUS CERTIFIED OFFICE


which can occur in conventionally reinforced PVC-U and which result in energy being lost.


Triple glazed and Krypton filled at Interserve, the windows achieve Uw values as low as 0.73W/m²K. They can also be fabricated double glazed and Argon filled to achieve Uw values of 1.1W/m²K.


The Interserve building uses some of the most advanced green building solutions available to achieve its Passivhaus status, including REHAU’s own AWADUKT Thermo ground – air heat exchanger system which draws ventilation air into the building through a network of underground pipes so that it is pre-warmed or pre-cooled depending on the season using the natural temperature of the earth.


To achieve its targeted reduction of 90% in energy usage and costs compared with a traditional office, the building has no gas fired space heating system, but instead relies on the solar gain achieved by installing the REHAU GENEO®


As well as using it as a showcase for


Passivhaus design, Interserve is also now evaluating the effectiveness of the various design solutions which also include highly insulated blocks with concrete infil, pre-cast concrete beams to provide some additional tempering, and timber cladding to increase the insulation performance.


www.rehau.co.uk


To read more news, log onto www.clearview-uk.com and join in our Forum discussions.


window is manufactured using the 100% recyclable fibre composite material, which is similar to the kinds of fire composites already used extensively in aircraft construction and Formula 1 design.


windows combined with


AWADUKT Thermo, a MVHR system and a small heat pump.


22 « Clearview NMS « January 2012 « www.clearview-uk.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100