Asphalt Maintenance Resurfacing (continued) Location


Second Street Spring Street Spruce Avenue Third Street Visart Street


Windsor Street Winter Street


From/To


Cedar Grove Crescent to Cranston Avenue Winter Street to end First Street to end


Cranston Avenue to end


Churchill Boulevard to Harrington Street Sand Cove Road to Havelock Street St. Paul Street to Stanley Street


Street Reconstruction


Street reconstruction is also part of the Roadway Maintenance Service. The service life of a street can be extended by asphalt maintenance resurfacing but eventually streets will need to be fully reconstructed. Street reconstruction involves excavation to remove the existing asphalt with replacement of the granular material below the asphalt. When required, new concrete curbs and sidewalks are installed followed by asphalt. The street reconstruction may include the renewal of underground utilities such as water, sanitary and storm sewers.


Location


Bleury Street Market Place Peel Plaza


Westfield Road Westmorland Road From/To


Molson Avenue to Sand Cove Road King Street West to St. John Street


Union Street to Hazen Avenue to Carleton Street area


Acamac Backland Road to Civic #2300 Westmorland Mall to Kervin Road


Water and Sewer Construction


Water and sewer construction is carried out to replace deteriorated underground pipes or to install new systems to support growth and development. Construction work is also required to upgrade the City’s water and sewerage pumping and treatment facilities to ensure the systems are maintained in a reliable state.